Skip to Content
Author's profile photo Jerry Wang

How to download ERP plant into CRM via request download

Requirement: You have performed initial download in CRM to download plants from ERP. Now you have made some further change on a given plant in ERP. You would like to synchronize those change back to CRM.

You can maintain plant information in ERP:

/wp-content/uploads/2016/09/clipboard1_1042032.png

/wp-content/uploads/2016/09/clipboard2_1042033.png

1. create new download request in CRM via tcode R3AR2. In Low field, maintain plant ID in ERP as value:

/wp-content/uploads/2016/09/clipboard3_1042064.png

2. perform request download via tcode R3AR4.

/wp-content/uploads/2016/09/clipboard4_1042065.png

Once done, you should see in tcode SLG1 that the download for plant 0001 is done successfully:

/wp-content/uploads/2016/09/clipboard5_1042066.png

3. Query table by ext_logno = plant id, then you can find Partner No. In this example it is 400562. A plant in ERP is mapped to a business partner in CRM.

/wp-content/uploads/2016/09/clipboard6_1042067.png

4. Use tcode BP and search against BP id you find in previous step:

/wp-content/uploads/2016/09/clipboard7_1042068.png

You can find that the change done on ERP plant is now synchronized into BP in CRM:

/wp-content/uploads/2016/09/clipboard8_1042069.png

5. If you assign a material into this plant 0001 in ERP, after this material is downloaded into CRM as a product, the corresponding relationship between generated BP for ERP plant and CRM product could be found in relationship tab “Location”:

/wp-content/uploads/2016/09/clipboard9_1042070.png

Assigned Tags

      Be the first to leave a comment
      You must be Logged on to comment or reply to a post.