We are creating Service Preqs with a material group entered on the preq which have been setup for different types of services. There is no material master in this case. We would like to be able to change this on a preq after the preq is released but ...
I have a query that I built in SQ01 which pulls togther some PO and vendor info, etc. I added the option for drill down to ME23N as I have done in the past with other queries:Goto > Report Assignment > Add > Other Report Type > TR Transaction ME23N
...
I'm having a tough time seeing if there would be any difference between these two scenarios below. We don't have production, so it's purely on demand goods issues for consumption.
VB Manual reorder point, with HB replenish to max.
Case 1: Reorder...
I found the answer elsewhere. Fyi, you can do this, I had to set the field selection on the release indicator field selection key rather than on the ME52N entry.
Since I didn't seem be getting great answers on this I ran a set of tests in my SAP test environment, set 2 materials as above, ran MRP to bring it up to 50 stock, and then did a goods issue from each for 45. Next MRP run then ordered 45 of each to b...
That link recommends not to bother with safety stock but you are saying you should. You didn't answer my question of comparing the 2 cases that I gave of if they would behave any differently.