former_member231735
Participant
Member since ‎05-16-2013

User Statistics

  • 182 Posts
  • 0 Solutions
  • 0 Kudos given
  • 2 Kudos received

User Activity

CA60 shows changes for Routing, however the user needs to enter the Material one by One. Looking for a report here for a list of materials, the routing changes. (Each material has a separate group)
Requirement is to exclude a MRP Element of specific" ORDER TYPE" in MD04. PrdOrd 00000xxxxxxx/Order Type Receipt/Reqmt Available Qty 1000 80 1080 (To show as 1000 EA) Ignore the 80 EA from Receipt/Reqmt for the Order type. (or) Exclude ...
There are 2 production orders with 1st order component "Requirements date" is say today 09/15/22 and Qty Required 10 nos. The 2nd order same component "Requirements date" (07/18/2024) is in future with Required Qty 10 nos.( its even after 1 st orde...
Production order (Collective orders). What does this "outline dates" in collective orders signify and how it works on scheduling.
how to add "user defined fields" in field set called field key. ? (i.e) In OPEC, system shows a set of fields. How to add more fields? How many fields I could add maximum?
Kudos from