Work Packages / Items
My Work Packages, My Work Items – New Authorization Object allowing the Control of the Dates Fields on the Dates tab in Work Package and Work Item. By default, the maintainability of the dates field is Allowed for the Work Package and Disabled for the Work Item. As in FB the Wave planning is an Architect driven procedure who is allowed to adjust the dates fields in WP which are filled by Project Management KPIs. The developer, working in the WI, doesn’t have this authorization, because he/she isn’t allowed to overrule the central planning.
My Work Packages – Create Defect Correction out of Work Package directly, without test plan, test package and defect. In case a Work Package is in status ‘To Be Tested’, the Work Package Owner, e.g. an Architect preparing a Sprint Review Meeting, can do an early and informal single functional test. As each Work Package is a testable unit, he/she can do this for each new Work Package in status ‘To Be Tested’. This supports easy and quick test/defect management to support an agile development strategy.
My Work Packages – New fields to maintain Value and Effort Points in Work Packages. To allow efficient Wave backlog planning on Work Package level, we introduced a field for Value and Effort Points. This allows a calculation of the Work Package Priority, e.g. to give those Work Packages a high priority which development brings a high value with a small development effort.
My Work Packages, My Work Items – Additional Filter Section for Status and Overdue Documents: Single or combined status values for Work Packages and Work Items, Overdue Work Packages and Work Items. The filters allow the efficient selection of your Work Packages and Work Items in the same status, e.g. to immediately see which ones are in repair and therefore have a Defect Correction assigned. The ‘Overdue’ filter section allows to quickly display your Work Packages and Work Items where the maintained date/milestone, in context to the status, is exceeded.
My Work Packages – Automated population of Project Manager field. The Project Manager is retrieved via the linked project and assigned Project Manager role in the top node of the Build Project. As the Architect doesn’t decide who’s the responsible Project Manager, the field is for display and can only be maintained in Project Management.
My Work Packages – New Test Management Tab in Work Package. Displays Test Packages and Test Plans the Work Package is assigned to. The Architect / Work Package Owner gets the test status summary of a Work Package. This includes direct links to the related Test Packages and test Plans to gain detailed information as well.
My Work Packages – New Business Role – Tester Use Case. Allows the assignment of testers to Work Package. The assignment is helpful as designated testers find the to be tested Work Package via their My Work Packages tile.
My Requirements, My Work Packages, My Work – New fields for who created and last changed the document. The Last changed by is filled with the business partner last changing values or setting a new status. Sometimes the one maintaining Requirements, Work Packages and Work Item is not the owner himself, but a supporting team member. These fields help to identify those resources, get in contact with them or do mass change operations based on the actions they performed.
My Work Packages, My Defect Corrections – Create Defect Correction as Follow Up Document in Single Functional Test – Work Package has status ‘To Be Tested’. Create Defect Correction as Follow up. Document of Work Package from ‘Scope’ Tab. Work Package status is automatically switched to status ‘In Repair’. In WP status ‘Handed Over to Release’ assigned and confirmed Defect Corrections are automatically switched to this status as well. Single Functional Test: Additional option for customers who prefer to perform SFT without Test Suite integration. Automated switch of Work Package status in case of new and confirmed Defect Correction.
Mass Change Application – Improve Selection Possibilities. For WP: Rephrase ‘Phase’ to ‘Wave’ selection field, New search for ‘Actual Release’, For WI & Defect Correction: Split selection Field Project Wave into two selection fields – Wave and Sprint, Classification search for WP and Work Item (GC and NC). Allows efficient status overview and backlog planning
Mass Change Application – Combined view for Work Items. Up to SP02 it was required to select either Work Items of Type GC or NC. Now a combined display or selective display can be chosen. Allows evaluation of all Work Items to be developed within a specific Wave, Sprint or Release