Order type selection for production orders:

When we create a Production order manually or convert from the Planned order, the order type for the Production order is selected automatically in the following priority

  1. 1. Order type defined in the Production scheduling Profile (OPKP)
  2. 2. Order type defined in the Production scheduling Profile assigned to the Production scheduler (OPJ9)
  3. 3. Order type defined in the Plant Parameter (OPPQ)
  4. 4. Order Type defined in the MRP Group Parameters (OPPR)

Order type defined in the Production scheduling Profile (OPKP)


OPKP.png


Order type defined in the Production scheduling Profile assigned to the Production scheduler (OPJ9)

/wp-content/uploads/2014/11/opj9_583844.png

Order type defined in the Plant Parameter (OPPQ)



/wp-content/uploads/2014/11/oppq_583825.png

oppq 2.png

/wp-content/uploads/2014/11/oppq3_583828.png

Order Type defined in the MRP Group Parameters (OPPR)

/wp-content/uploads/2014/11/oppr_583816.png

/wp-content/uploads/2014/11/oppr2_583823.png

/wp-content/uploads/2014/11/mm03_583846.png

hope, this information helps to understand the Order type selection for production orders.

To report this post you need to login first.

3 Comments

You must be Logged on to comment or reply to a post.

    1. Ravindra Kulkarni Post author

      i created the document with description and instead of typing have attached JPG images of the document. also the document is attached. For your information tcodes are there if you want to check in the system.

      Also, If you feel this information is useful, or you feel any more details required, please let me know.

      Regards,

      Ravindra

      (0) 

Leave a Reply