cancel
Showing results for 
Search instead for 
Did you mean: 

SAP Portal upgrade from CE7.3 EHP1 SPS9 to CE7.4

Amey-Mogare
Contributor
0 Kudos

Hello All,

We need to migrate from CE7.3 EHP1 SPS9 Portal to CE7.4 Portal and would like to know your comments/suggestions/experiences on the same.

Following are our landscape layout: -

1. Consumer Portal (to be upgraded from CE7.3 EHP1 SPS9 to CE7.4)

2. Consumer Portal is connected to 10 producer portals (NW7.0) via RAI (remote app integration).

3. Consumer Portal is connected to SAP ECC R/3 backends (WD ABAP iViews, BSPs, ITSs, UWLs)

4. Consumer Portal is connected to CE servers hosting BPM applications (WD Java apps, UWL workitems)

Queries: -

1. What will be impact on connected producer portals?

2. What will be impact on SAP ECC R/3 integrated apps?

3. What will be impact on CE servers?

4. Would there be any Portal content migrated required?

5. We have done many configurations on NWA level for many applications and there are many backgroud jobs that are configured.

     Would these need to be re-configured?

6. Would there be any need to migrate DCs that are present in track?

7. We have SPNEGO based kerberos SSO configured. Would this need to be re-configured?

All these that I can think of now.

Kindly share your comments and also, please bring out topics that I might have missed.

Thanks & Regards,

Amey

Accepted Solutions (0)

Answers (1)

Answers (1)

troy_cronin2
Active Contributor
0 Kudos

Hi Amey

I hope you are well and many thanks for using the SAP Discussion Forums .

Ok you have quite a few questions here so lets see if we can work through them together .

Scenario: You need to migrate from CE7.3 EHP1 SPS9 Portal to CE7.4 Portal and would like to know comments/suggestions/experiences on this particular scenario.

Regarding your queries and comments the answers to these can be found in the following documentation which has been developed in a bid to provide an informative overview along with a comprehensive guideline structure.

Upgrade & Migration Approach 7.3

http://scn.sap.com/people/sushil.aher2/blog/2012/02/14/sap-nw-73-portal-upgrade-approach

Migration Lessons

http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/df656b89-0a01-0010-8b8b-a38108f99...

Also the below blog post:

http://scn.sap.com/community/enterprise-portal/blog/2012/09/09/lessons-learned-in-migration-to-porta...

Kindly review the documentation outlined above and if you have any more questions please feel free to ask me.

Kind Regards

Troy Cronin - Enteprise Portal Support Engineer

Follow: @troycronin

Amey-Mogare
Contributor
0 Kudos

Hello Troy,

Thanks a lot for detailed & helpful reply.

Could you please let me know if there will be any challenges/issue between RAI (Remote App Integration) type scenarios between consumer & producer portals?

We have 1 consumer which is CE7.3 EHP1 SPS9 which we want to upgrade to CE7.4.

This consumer is connected to 10 producer portals which are on NW7.0 version.

Kindly let me know if you have any useful info on this.