cancel
Showing results for 
Search instead for 
Did you mean: 

Migrating SAP ECC system to S/4 HANA latest version-Impact on SAP EP perspective

prasadv321
Explorer

Hi Experts,

Currently we are using SAP NetWeaver Portal 7.5 which is integrated with different systems (SAP ECC, BW, CRM...etc..).

As per the plan currently we are planning to migrate only the existing SAP ECC system to S/4 HANA latest version.

from the EP perspective, we have standard WebDynpro Java, custom WebDynpro ABAP and Transaction Iviews and UWL are accessed via SAP Portal 7.5 by the end users.

Please let me know we need to take care or will face any issues in all the applications (WDJ, WDA and Transaction Iviews) as it is in SAP Portal 7.5 after the migration of ECC system to S/4 HANA by establishing the SSO.

I have following questions related to this migration:

1) is it will impact on which areas in EP perspective?
2) What are the advantages and disadvantages from EP perspective?
3) Currently All standard WDJ applications are accessed via Destinations (Model and Meta Data Destinations) in the existing ECC system for the RFC calls. so after the migration of SAP ECC to S/4 HANA can we still establish the Model and Meta data destinations call to the S/4 HANA system from Portal 7.5 for the RFC calls.
4) Do we still need NetWeaver(NW- EP server) box when we move to S4HANA.

Request you to please help on any existing blogs and share your inputs on this.

Thanks you in advance.

Regards,
Prasad

prasadv321
Explorer
0 Kudos

Hi Experts,, Awaiting for your kindly reply...Kindly help on this..Thanks in advance.

Accepted Solutions (0)

Answers (4)

Answers (4)

ROHITGERA1
Participant
0 Kudos

Hi Prasad,

EP box is not required if you don't have any Java application or backend application integrated with EP.

Please check with your basis team of they are using Adobe Document Service from Java Instance (EP)

If there is no dependency on EP, then you don't required EP Server. Hope this will clarify your doubt.

 

Regards,

Rohit Gera

 

ROHITGERA1
Participant
0 Kudos

Hi Prasad,

Are you using Fiori launchpad for the UX. There should be either EP or Fiori Launchpad where user will able to login and access the application.

 

prasadv321
Explorer
0 Kudos

Hi Rohit,

Hope you are doing good !!

We are not using any FLP in EP and which area impact or need to take care if we migrate to backend only ECC to S/4 HANA,

Thanks in advance

Regards,

Prasad

ROHITGERA1
Participant
0 Kudos

Hi Prasad,

As per my knowledge, you will be able to perform the SSO between EP and S/4HANA system.

For long term perspective, also plan for transition from EP to FLP.

 

Reference Note: 2251604 - Version Interoperability between SAP S/4HANA On Premise Edition and SAP NetWeaver Systems

Regards,

Rohit Gera

prasadv321
Explorer
0 Kudos
Hi Rohit Gera, Thank you so much for your reply, only SSO and system object connections only impact from EP side ? Any other area or steps need to perform from EP side for from backend system ECC migration to S/4 Hana? Do we still need NetWeaver(NW- EP server) box when we move to S4HANA? Kindly help on the above points. Thank you in advance. Regards, Prasad
ROHITGERA1
Participant
0 Kudos
Hi Prasad,
prasadv321
Explorer
0 Kudos
Hi Rohit Gera, Thank you so much for your reply, only SSO and system object connections only impact from EP side ? Any other area or steps need to perform from EP side for from backend system ECC migration to S/4 Hana? Do we still need NetWeaver(NW- EP server) box when we move to S4HANA? Kindly help on the above points. Thank you in advance. Regards, Prasad
prasadv321
Explorer
0 Kudos

Please help any one on this...