S4 HANA FASHION with eWM Advanced Production

luiz_feliponi1
Explorer
0 Kudos

I have an interesting challenge in my production line supply scenario where we use yarn cones. The cones are stored in kilograms (KG), but the production line requires supply in cone units. Each cone typically contains 2.5 kg of yarn.

We have a set of looms, some of them have a fast production supply area with space for 100 cones, some have 110, and so on.

The issue arises when planning production orders, which are based on the consumption of a specific amount of raw material, for example, 200 kg of cotton yarn. In the production order planning, the material requirement is calculated generically for all looms without considering these different storage capacities in the production supply areas.

During the production process, it is common to need more yarn or, in some cases, return unused yarn to the inventory. Additionally, we may also can consume the exceeding yarn on another machine to fulfill a subsequent order, provided that the supplier batch remains the same.

I would like to know the best* configuration strategy in SAP Extended Warehouse Management (eWM) and SAP Production Planning (PP) to efficiently handle this challenging scenario.

* We should handling this all over the RF terminal, without change the eWM delivery order, task, whatever. It means, with less bureaucracy possible.

Dsk
Active Contributor

Hi,

1. All cones are in KG and that is the real UOM

2. But as you will be feeding it as weft we also need to know how many cones is required and some times there will be partial cones which has been removed by near by loom / stores will also be supplied.

3. When you do your weft planning we need to prepare some custom development to inform how many cones and what is the weight per cone you are looking for.

No direct solution is available in SAP for this ( as per my understanding)

Br,

dsk

Accepted Solutions (1)

Accepted Solutions (1)

elhachm
Explorer
0 Kudos

Hi,

As you should remain flexible as i understand, i think you should use the Advanced Production Integration using PMR between PP and EWM.

This will allows you to request additional quantities if needed by creating additional WT in SAP EWM through the production staging cockpit.

Regards,

Answers (0)