We don't want the production order become deallocated in APO-PP/DS after below action in ECP and need your guidance and help for this situation. Thank you..
The steps are:
- I enter CO02 with a production order
- For the production order, I choose Functions>>Read PP Master Data which is a standart function
- After Read PP Master Data run for the production order, I check the production order in SCM-APO-PP/DS system.
- In SCM-APO-PP/DS system the order status becomes deallocated due to Read PP Master Data action in ECC system. There is CIF integration between ECP and SCP.
Thank You very much..