cancel
Showing results for 
Search instead for 
Did you mean: 

Skip lot for Inspection Plan Group

former_member201849
Contributor
0 Kudos

Hello Experts,

Is there any possibility of skipping the lots for the Inspection Plan Group.

As per my knowledge, we can skip the lots at three levels (Inspection Type, Inspection Lot, Characteristic Level).

We have a list of materials (In-house and Externally procured) with different Inspection Types and all these materials are assigned to same Inspection Plan Group.

My Requirement is If any of the material is Inspected within the group and taken the Usage Decision then other material lots should be skipped based on the DMR (Dynamic Modification Rule) which are in the same Inspection Plan Group.

We got this requirement to save the time of the labor hours.

I know it is not possible in Standard SAP, Could you please give me some guidance on Enhancement.

Regards,
Suresh.M

Accepted Solutions (0)

Answers (1)

Answers (1)

mlocher
Explorer

Hello Suresh

You might want to explore the possibilities you have in Exit QDSE0002. (taking into account OSS 2200780).

We are not having the same requirement as you but manipulating in this exit the level of the DMR selected based on previous inspections lot details. So instead of switching to the SKIP level for example, we are switching to a special test level of the DMR. Most probably you can do the same in checking on the plan group of other inspection lots. Our DMR rule is though setup "at lot creation" and not at UD.

Regards,

Markus