on 01-09-2024 4:25 AM
Dear All,
My customer is using a ECC 6.0
My customer have been using a Cost componet structure(Aux CCS) and primary Cost componet spit.
My customer wants to devide a material cost by using Origin group.
I have set up orign group and inserted origin group in material master.
And I have defined a Cost Component Structure IMG, I have changed a original Cost Component Structure
But material Cost was not devided in Aux CCS
And I have made a new Cost componet structure. Material cost was devided by using Origin group.
I have a question.
question1
Is it impossible a material cost devide by using Origin group by original Cost Component Structure?
If it is possible to devide by using Origin group by original Cost Component Structure. Please let me know what to do.
question2
If it is not possible a material cost devide by using Origin group by original Cost Component Structure.
So If i have to create a new cost component structure, does it impact a basic Stock cost componet structure and other
problem . if is does impact anything. I am going to use an new cost Component Structure.
Thanks. regards.