cancel
Showing results for 
Search instead for 
Did you mean: 

batch determination with SLED 00.00.0000

Former Member
0 Kudos

Hi

I use batch determination and LOBM_RLZ to avoid using batch with SLED in the past.

Everthing works fine as i used LOBM-UBD dependency.

But i have a problem, for some materials, the SLED is not managed bt my client, so, the determination batch is not working (I think ECC considers that 00.00.0000 is a date in the past)

I tried to put a condition in the LOBM_UBD dependency to execute the Function only if the VFDAT is specified, but it does not work.

Any idea

Thanks

Salah

Accepted Solutions (0)

Answers (3)

Answers (3)

shailesh_mishra5
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello,

Since you said that for some materials SLED is not maintained, so in that case, I believe system is failing to find the values of shelf life data which is stored in table in MCH1-VFDAT and MCHA-VFDAT. Also important is at which level batch is activated.

Former Member
0 Kudos

I' m calling the batch determination in Migo transfer between two storage locations.

Regards

Salah

shailesh_mishra5
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello,

At which logistical point, you are calling batch determination? Production or at outbound delivery? Is this batch determination in the outbound delivery for Stock transport order?

Best regards

Shailesh Mishra