|
Blogs by

shyam prasad

Planning calendar is use at material level and you can assign this in MRP2 view along with lot size procedure (period lot size according to planning calender PK). By doing this procurement proposals will be

Control Keys: A control key uses the following keys and indicators to determine how an operation or a sub-operation is to be processed in a task list. The following parameters shall be set in the