|
Blogs by

Mahesh Sardesai

This blog is for the detailed steps for Custom Code Migration (CCM) for step t5 of conversion to S/4HANA 1809FPS0 is an optional step. The steps are shown for Custom Code Analysis to estimate efforts required for the Custom

In this blog we will cover how to create your own instance of S/4HANA as Fully activated appliance from Cloud Appliance Library. It just takes 2 hrs to create the instance and the charges are

The blog is for conversion of source system ERP6/EHP6 to target system S/4HANA 1809FPS0 showing the Realize Phase – t5- SUM from EHP6/mss as below: Please find other blogs as follows: S/4HANA  SQUARE  ONE NEW INSTALLATION PART 1 –

The blog is for conversion of source system ERP6/EHP5 to target system S/4HANA 1809FPS0 showing the Realize Phase – t5- SUM from EHP5/ora as below: Please find other blogs as follows: S/4HANA  SQUARE  ONE NEW INSTALLATION PART 1 –

The blog is for conversion of source system ERP6/EHP6 to target system S/4HANA 1809FPS0 showing the Realize Phase – t5- SUM from EHP6/db6 as below: Please find other blogs as follows: S/4HANA  SQUARE  ONE NEW INSTALLATION PART 1

This blog is for the detailed steps for Readiness Check (RC) for step t2 of conversion to S/4HANA 1809FPS0. Readiness Check is an optional step and is a high level analysis to get a Results  Dashboard and also download to a Results

The procedure below is for conversion of source system SOH – ERP6/EHP7 to target system S/4HANA 1809FPS0 showing the Realize Phase – t5- h7 – SUM as below: Please find other blogs as follows: S/4HANA  SQUARE

This blog is for Conversion from ECC6/EHP7 to S/4HANA 1809FPS0 – t3 of the conversion steps to be done in sequence below. Simplification Item Catalog is a tool that allows you to search or browse the complete

This blog is for Conversion from ECC6/EHP6 to S/4HANA 1809FPS0 – t3 of the conversion steps to be done in sequence below. Maintenance Planner (MP) checks your components, add-ons, active business functions and industry solutions to ensure compatibility

References – Updating SAP ABAP Systems on UNIX and Linux: SAP HANA DB – SUM 2.0 SP03 The procedure below is for upgrade of source system S/4HANA 1610FPS1 system to target system S/4HANA 1809FPS0 showing the