SAP Standard PP Reports

 

Transaction CodeDescription
CA51Print Rtg/Ref.Op.Set, Fields Fixed
CA70PRT Where-Used Lists
CA80Use of Work Center in Task Lists
CA90Use of Ref. Op. Set in Routings
CO09Availability Overview
CO24MissingPartsInfoSyst
CO46Order progress report
COOISProduction Order Information System
CR05Work Center List
CR06Work Center Assignment to Cost Ctr
CR07Work Center Capacities
CR08Work Center Hierarchy
CR15Capacity where-used
CR60Work center information system
CS11Display BOM Level by Level
CS12Multilevel BOM
CS13Summarized BOM
CS14BOM Comparison
CS15Single-Level Where-Used List
MB53Display Plant Stock Availability
MC9CReports for Flexible Planning
MCP1SFIS: Operation Analysis Selection
MCP3SFIS: Material Analysis Selection
MCP5SFIS: Material Analysis Selection
MCP7SFIS: Work Center Analysis Selection
MCREMaterial Usage Analysis: Selection
MCRIProduct Cost Analysis: Selection
MD04Display Stock/Requirements Situation
MD05Individual Display Of MRP List
MD06Collective Display Of MRP List
MD07Current Material Overview
MD16Collective Display of Planned Orders
MD44MPS Evaluation
MD45MRP List Evaluation
MD46Eval. MRP lists of MRP controller
MD47Product Group Planning Evaluation
MD48Cross-Plant Evaluation
MD4CMultilevel Order Report
MD63Display Planned Indep. Requirements
MD73Display Total Indep.Requirements
MD79PP Demand Mngmt - XXL List Viewer
MDLDPrint MRP List
MF52Planning Table -Display
MM60Materials List
MMBEStock Overview
MS04Planning Scenario: Stock/Reqmts List
MS05Long-term planning: display MRP list
MS06Long-term plnng: collective MRP list
MS07Long-Term Plng: Material Overview
MS44Flexible Evaluation Long-Term Plnng
MS65Requirements Situation
MSLDPrint MRP List; Long-Term Planning