Production Integration with Warehouse Management in SAP S/4HANA Cloud – Demo Examples

In this blog post I would like to highlight the differences in Scope Item 3DV: Warehouse Production Integration between IM-Managed and WM-Managed psa in a production process and the configuration steps that are necessary to be able to execute these processes. As a beginner you can quickly get into difficulties. Therefore, this blog should support you to be able to set up and test the process.

Scope Item 3DV: Warehouse Production Integration – IM-Managed PSA

 

First, let’s look at the IM-Managed PSA process and the corresponding configurations.

Scope%20Item%203DV%3A%20Warehouse%20Production%20Integration%20-%20IM-Managed%20PSA

Scope Item 3DV: Warehouse Production Integration – IM-Managed PSA

 

In our test example we have our final product TG20_SerialC_P and the components RM20 and TG20_SerialA. The components are in a WM-managed warehouse and need to be transferred to production storage location 101B. The final product is then placed into storage location 101B.

Demo Example:

We need to create a production order with the app „Create Production Order“.

App%3A%20Create%20Production%20Order

App: Create Production Order

 

We enter our material and production plant.

Production%20Order%20Create%3A%20Initial%20Screen

Production Order Create: Initial Screen

 

In total we will manufacture 2 of the material TG20_SerialC_P.

Production%20Order%20Create%3A%20Header

Production Order Create: Header

 

The warning indicates that the required components are not in stock.

Warning%3A%20Missing%20Parts

Warning: Missing Parts

 

In the tab “Goods Receipt” we enter our production storage location “101B” as location.

Production%20Order%20Create%3A%20Goods%20Receipt%20Locationembly”.

Production Order Create: Goods Receipt Location

We can find here an overview of the components and from which storage location they are withdrawn.

Production%20Order%20Create%3A%20Component%20Overview

Production Order Create: Component Overview

 

As production step we have defined our work center “Assembly”.

Production%20Order%20Create%3A%20Operation%20Overview

Production Order Create: Operation Overview

 

Despite the warning, we release the production order.

Release%20Order%20Warning

Release Order Warning

 

Release%20carried%20out

Release carried out

 

After saving, the production order is created.

Production%20Order%20created

Production Order created

 

In the next step, we need to transfer the necessary components from our WM storage location to our production storage location in the “Stage Materials for Production” app.

App%3A%20Stage%20Materials%20for%20Production

App: Stage Materials for Production

 

We mark SLoc Level, enter our production order number in the “Production/Process Orders” tab and start the transaction.

Note: Selection Horizon for Reqmts date should/must be in the future.

Material%20Staging%20for%20Production

Material Staging for Production

 

Below we can see our missing components.

Missing%20Components%20Overview

Missing Components Overview

 

By selecting the two lines and clicking on “Replenishment Elements” and then on “Replenishment Proposals”, the replenishment will be proposed to us by the system.

Replenishment%20Proposal

Replenishment Proposal

 

In this step we have to mark the two lines below and click on “Stage”. But in order to see what happens in the background, we have to check “Menu -> Global Settings -> Dialog -> Display message log automatically”.

Replenishment%20Proposal

Replenishment Proposal

 

Replenishment%20Proposal

Replenishment Proposal

 

Display%20Message%20Log

Display Message Log

 

After we click on Stage, the status is green at the top and now we can save. After that, Outbound delivery form a WM storage location will be created for us.

Replenishment%20Confirmed

Replenishment Confirmed

 

Note: Do not forget to click on “Exit”, otherwise the outbound order will not be created.

Display%20Message%20Log

Display Message Log

 

Now we need to go to the “Run Outbound Process – Production” app to provide our components to the production location.

App%3A%20Run%20Outbound%20Process%20-%20Production

App: Run Outbound Process – Production

 

Process%20Outbound%20Delivery%20-%20Production

Process Outbound Delivery – Production

 

We will now create Warehouse Tasks for this purpose.

Create%20Warehouse%20Tasks

Create Warehouse Tasks

 

Warehouse%20Tasks%20created

Warehouse Tasks created

 

The warehouse tasks must now be confirmed. For both components, fixed storage bins are assigned, control cycles are defined and now moved to the storage bin “PROD-SUPPLY”.

Confirm%20Warehouse%20Tasks

Confirm Warehouse Tasks

 

Since the TG20_SerialA material is serial numbered, we have to enter the serial numbers in our delivery.

Missing%20Serial%20Numbers

Missing Serial Numbers

 

Enter%20Serial%20Numbers

Enter Serial Numbers

 

Now we click on “Goods Issue”.

Post%20Goods%20Issue

Post Goods Issue

 

Here we see that the status is 100%. This means, it has been performed successfully.

Goods%20Issue%20Process%20completed

Goods Issue Process completed

 

In the Stock Overview you can see the overview with 2 pieces with the respective materials for 101B.

Stock%20Overview%3A%20RM20

Stock Overview: RM20

 

Stock%20Overview%3A%20TG20_SerialA

Stock Overview: TG20_SerialA

 

Next, we need to perform our production operations. To do this, we go to the “Confirm Production Operation” app.

App%3A%20Confirm%20Production%20Operation

App: Confirm Production Operation

 

We look for our production order and the corresponding operation. Then we click on “Post and Complete”.

Confirm%20Production%20Operation

Confirm Production Operation

 

Since we are working with serial numbers, we need to search for our production order in the “Post Goods Movment” app under Goods Issue -> Order.

App%3A%20Post%20Goods%20Movement

App: Post Goods Movement

 

Post%20Goods%20Movement

Post Goods Movement

 

In the tab “Serial Numbers” for the material TG20_SerialA we have to enter the serial numbers. Without having to go into the delivery order, we can use the search icon to find respective serial numbers.

Search%20for%20entered%20Serial%20Numbers

Search for entered Serial Numbers

 

Overview%20of%20entered%20Serial%20Numbers

Overview of entered Serial Numbers

 

Now we can post consumption for both products.

Post%20Goods%20Issue

Post Goods Issue

 

Goods%20Issue%20posted

Goods Issue posted

 

In the Stock Overview you can see that the consumption has been successfully posted and there is no more stock in the production storage location 101B.

Stock%20Overview%3A%20RM20

Stock Overview: RM20

 

Stock%20Overview%3A%20TG20_SerialA

Stock Overview: TG20_SerialA

 

Next, we go to the “Post Goods Receipt for Production Order” app and search for our production order. Then we click on “Post”.

App%3A%20Post%20Goods%20Receipt%20for%20Production

App: Post Goods Receipt for Production

 

Post%20Goods%20Receipt%20for%20Production%20Order

Post Goods Receipt for Production Order

 

Material%20Document%20posted

Material Document posted

 

Stock%20Overview%20RM20

Stock Overview: RM20

 

Stock%20Overview%3A%20TG20_SerialA

Stock Overview: TG20_SerialA

 

This completes our Production Integration process with IM-Managed PSA with WM.

 

Settings for IM-Managed PSA:

First, let’s take a look at our Work Center. The most important part is the Supply Area. The PSA_01 is defined for an IM-managed PSA production process.

Configure%20Work%20Center

Configure Work Center

 

Next, we look at the app “Create Control Cycle for WM”. We define our Supply Area “PSA_01” for the material RM20 as well as for TG20_SerialA.

Configure%20Control%20Cycle

Configure Control Cycle for RM20

 

The important parameters are Destination and Source. As source we have our WM storage location and as destination our production storage location, which is IM-managed.

Configure%20Control%20Cyclce

Configure Control Cycle for RM20

 

Configure%20Control%20Cycle%20for%20TG20_SerialA

Configure Control Cycle for TG20_SerialA

 

Configure%20Control%20Cycle%20for%20TG20_SerialA

Configure Control Cycle for TG20_SerialA

 

The next step is to define the Production Supply Area.

App%3A%20Maintain%20Production%20Supply%20Area

App: Maintain Production Supply Area

 

We mark the relevant line and have a look at the details.

Define%20Production%20Supply%20Area

Define Production Supply Area

 

The Storage Location is defined as 101B. This shows that this production supply area is located in 101B.

Define%20Production%20Supply%20Area

Define Production Supply Area

 

Under “Change Material App” in the “MRP 2” tab, it is important to enter 105W as the Production Storage Location. This indicates that this component will be supplied from this storage location for production. This step must be performed for both components.

Change%20Material%3A%20RM20

Change Material: RM20

 

Change%20Material%3A%20TG20_SerialA

Change Material: TG20_SerialA

 

We define for our final product “TG20_SerialC_P the Production Storage Location which is 101B.

Change%20Material%3A%20TG20_SerialC_P

Change Material: TG20_SerialC_P

 

These are the necessary steps that must be performed to accomplish production integration with an IM-Managed PSA.

 

Scope Item 3DV: Warehouse Production Integration – WM-Managed PSA

 

Next, let’s look at the WM-Managed PSA and the required configuration steps.

3DV%3A%20Warehouse%20Production%20Integration%20-%20WM-Managed%20PSA

3DV: Warehouse Production Integration – WM-Managed PSA

 

Demo Example:

We need to create a production order using the “Create Production Order” app.

App%3A%20Create%20Production%20Order

App: Create Production Order

 

We enter our material and production plant.

Create%20Production%20Order

Create Production Order

 

In total we will manufacture again 2 pieces of the material TG20_SerialC_P.

Production%20Order%20Create%3A%20Header

Production Order Create: Header

 

In the tab “Goods Receipt” we enter our production storage location “105W” as location.

Production%20Order%20Create%3A%20Location

Production Order Create: Location

 

Here we find an overview of the components and from which storage location they are withdrawn.

Production%20Order%20Create%3A%20Components%20Overview

Production Order Create: Components Overview

 

As a production step, we have defined our Work Center “Assembly”. Then we click on “Release Order” and press “Save”.

Production%20Order%20Create%3A%20Work%20Center

Production Order Create:Operation Overview

 

Release%20carried%20out

Release carried out

 

A production order is now created.

Production%20Order%20created

Production Order created

 

Next, we need to provide the necessary components from our WM storage location in the “Stage Materials for Production” app.

 

We check EWM Rel. Parts and EWM Pick Parts, enter our production order number in the tab “Production/Process Orders” and start the transaction. Note: Selection Horizon for Reqmts the date should/must be in the future.

App%3A%20Stage%20Materials%20for%20Production

App: Stage Materials for Production

 

Now we see our missing components.

By checking the two lines and clicking on “Replenishment Elements” and then on “Replenishment Proposals”, the system will propose a replenishment.

Replenishment%20Overview

Missing Components Overview

 

In this step we now have to mark the two lines below and click on “Stage””. But in order to see what happens in the background, we have to activate “Menu -> Global Settings -> Dialog -> Display message log automatically”.

Display%20Message%20Log

Display Message Log

 

Replenishment%20Overview

Replenishment Overview

 

After selecting the Replenishment elements and clicking on Stage, the status switch to green at the top and now we can save. After that, a Posting Change Item will be created. Now click on “Exit”.

Replenishment

Replenishment Confirmed

 

Display%20Message%20Log

Display Message Log

 

Now we go to the “Process Posting Change Item” app.

App%3A%20Process%20Posting%20Change%20Item

App: Process Posting Change Item

 

Here we find our Posting Change Item and select both lines. Now create two Warehouse Tasks.

Process%20Posting%20Change%20Items

Process Posting Change Items

 

Below we mark our created Warehouse Tasks and confirm them. Thus, both components have been provided to our storage bin PROD-SUPPLY-2 for production.

Warehouse%20Tasks%20Confirmation

Warehouse Tasks Confirmation

 

Warehouse%20Task%20Confirmation%20Message%20Log

Warehouse Task Confirmation Message Log

 

In the “Warehouse Monitor” app under “Stock and Bin -> Storage Bin” we can see under PROD-SUPPLY-2 that both components are stored in this storage bin.

App%3A%20Warehouse%20Monitor

App: Warehouse Monitor

 

Warehouse%20Monitor%3A%20Stock%20Overview

Warehouse Monitor: Stock Overview

 

Next, we need to perform our production operations. To do this, we go to the “Confirm Production Operation” app.

App%3A%20Confirm%20Production%20Operation

App: Confirm Production Operation

 

To do this, we look for our production order and the corresponding operation.  Then click on “Post and Complete”.

Confirm%20Production%20Operation

Confirm Production Operation

 

Next, we go to the “Post Goods Receipt for Production Order” app and search for our production order. Then we click on “Post”.

App%3A%20Post%20Goods%20Receipt%20for%20Production%20Order

App: Post Goods Receipt for Production Order

 

Post%20Goods%20Receipt%20for%20Production%20Order

Post Goods Receipt for Production Order

 

Inbound%20Delivery%20will%20be%20created

Inbound Delivery will be created

 

Now an inbound delivery is created. The inbound delivery is processed under “Change Inbound Deliveries – Production”.

App%3A%20Change%20Inbound%20Deliveries%20-%20Production

App: Change Inbound Deliveries – Production

 

Process%20Inbound%20Delivery

Process Inbound Delivery

 

First, we click on “Goods Receipt”. Then we create a Warehouse Task for this purpose.

Post%20Goods%20Receipt

Post Goods Receipt

 

Create%20Warehouse%20Tasks

Create Warehouse Tasks

 

Confirm%20Warehouse%20Tasks

Confirm Warehouse Tasks

 

The Warehouse Tasks are then processed in the app “Process Warehouse Tasks”.

App%3A%20Process%20Warehouse%20Tasks

App: Process Warehouse Tasks

 

We select our Warehouse Task and click on “Confirm”.

Confirm%20Warehouse%20Tasks

Confirm Warehouse Tasks

 

In the app “Warehouse Monitor” under “Stock and Bin -> Physical Stock” we can find our stored product.

App%3A%20Warehouse%20Monitor

App: Warehouse Monitor

 

Warehouse%20Monitor%3A%20Stock%20Overview

Warehouse Monitor: Stock Overview

 

With that our Production Integration process with WM-Managed PSA with WM has been performed and completed.

 

Settings for WM-Managed PSA:

First, let’s take a look at our Work Center. The important thing here is the Supply Area. The PSA_02 is defined for a WM-Managed PSA production process.

Note: If you do not change the supply area, then in production order the wrong storage location will be found and the app stage materials for production will not work.

Configure%20Work%20Center

Configure Work Center

 

Next, we look at the app “Create Control Cycle for WM”. We define our Supply Area “PSA_02” for the material RM20 as well as for TG20_SerialA.

Important are the Destination and Source. As Source and as Destination we have our WM storage location, which is our production storage location.

Configure%20Control%20Cycle%3A%20RM20

Configure Control Cycle for RM20

 

Configure%20Control%20Cycle%3A%20TG20_Seriala

Configure Control Cycle for TG20_SerialA

 

The next step is to define the Production Supply Area.

App%3A%20Maintain%20Production%20Supply%20Area

App: Maintain Production Supply Area

 

 

We mark the relevant line and look at the details.

Define%20Production%20Supply%20Area

Define Production Supply Area

 

The Storage Location is defined as 105W. This shows that this production supply area is located in the 105W.

Define%20Production%20Supply%20Area

Define Production Supply Area

 

Under “Change Material App” in the “MRP 2” tab, it is important to enter 105W as the Production Storage Location. This indicates that this component will be provided from this storage location for production. This step must be performed for both components.

Define

Change Material: RM20

 

Change%20Material%3A%20TG20_SerialA

Change Material: TG20_SerialA

 

We define for our final product “TG20_SerialC_P as Production Storage Location 105W.

Change%20Material%3A%20TG20_SerialC_P

Change Material: TG20_SerialC_P

 

 

In conclusion, both processes have their advantages and disadvantages. To what degree, which process is best suited for one, is individual. The process itself is the same, but there are some differences in the WM-Managed PSA. For example, no outbound delivery is created, but a Posting Change Item. The additional step Post Goods Receipt via an Inbound Delivery is also omitted.
I hope that I could bring some light into the darkness with this. Have fun testing!

 