With the new release of S/4 HANA 1909 which had added many new functionalities in SAP EWM embedded versions, one more simplification is rendered in area of ”Material staging with release order parts in repetitive manufacturing.

Prior to S/4 HANA 1909, material staging as well as consumption in repetitive manufacturing was applicable with one IM managed storage location, thus warehouse does not have bin level visibility of inventory.

S/4 HANA 1909 has introduced staging and consumption from EWM managed slocation.

This blog is written to explain how material staging can be conducted from Warehouse to Production supply with the 2 EWM managed storage location.

The below diagram gives a clear indication of integration for diagram 1.

 

.The initiation point of the staging will be REM planned order.

 

With MF60, the staging of the release order parts for multiple orders can be executed.

 

The bom components are replenished from Whse(Sloc WAFS EWM managed) to PSA( E100 EWM managed)

 

 

The whole process can be explained with below process flow.

 

 

System creates a outbound delivery on saving the MF60 which in turn creates posting change in EWM. This posting change creates staging warehouse task which moves component from Whse to PSA

 

 

Create a pick HU to move the packed component from Whse to PSA.

 

 

Now with RF gun, component can be staged from WHSE to PSA.

 

HUs are moved to PSA(P2 stock type) which will wait for production to finish, once production is finished, consumption of HUS can be posted by MFHU.

 

For synchronously backflushing of Handling units, please check my below blog.

Synchronous backflushing of handling units from repetitive manufacturing into EWM embedded in SAP S/4HANA 1909

 

 

 

Best regards

Shailesh Mishra

Assigned Tags

      3 Comments
      You must be Logged on to comment or reply to a post.
      Author's profile photo Anil Kumar Myathri
      Anil Kumar Myathri

      Hi Shailesh

      At first ,Thanks for the PP EWM integration  insight .

      I have treid for PMR scenario  in 1909but staging is not working (through FIORI app ) neither a log shows clear error message in SLG1.

      I think its not determing source st.type /bin but why log doesn't show the message.

      now trying to enter the source dat in debuging,,still no success.

      Do you have any Suggestion on this ,Thanks in Adv

      Author's profile photo Sarah Früh
      Sarah Früh

      Hello Shailesh,

      Thank you for your blog entry. I would like to set up exactly the scenario you described (except that the storage locations for issue and replenishment are the same).

      I can create replenishment proposals in MF60. The replenishment elements also show the correct data (issuing storage location, PSA, warehouse number and replenishment storage location) for the replenishment element EWMRel, but the system does not create an outbound delivery in ERP (and therefore no replicated posting change in EWM) via the "Stage" button. No error message is issued and the log remains empty. What customizing settings have you made?

      Many thanks in advance.

      Regards Sarah

      Author's profile photo Piotr Pudelski
      Piotr Pudelski

      Hello

       

      I have configured this as you described and it all works fine but the issue is during MFBF - there is such standard message issued which tells that it is impossible to use EWM sloc in EWM-PP which is really strange: