Enterprise Resource Planning Blogs by Members
Gain new perspectives and knowledge about enterprise resource planning in blog posts from community members. Share your own comments and ERP insights today!
cancel
Showing results for 
Search instead for 
Did you mean: 
Ruthvik
Active Contributor
Hello Friends,

In this Blog will discuss What's New about Predictive Material and Resource Planning (pMRP)

With SAP latest release on 1909 HANA On-Premises Version, new functionality has been introduced to improve Capacity Issues, the new functionality is pMRP - Predictive Material and Resource Planning

The same is available in 1905 Cloud version as well

Before we go in detail it's not Existing MRP (Material Requirement Planning) it’s a brand new functionality.

PMRP helps us to identify capacity load issues and solve them early in the planning stage itself.

The main motto of pMRP is to identify capacity issues and to evaluate possible cases at early based on the requirements plan it uses a simplified material requirements algorithm.

Based on the results of the simulation, production planners or Shopfloof incharges will take decisions on changed conditions, for example, whether to make the product or buy the product.

pMRP Process


pMRP Process will as per below flow, will discuss in detail one by one. before that Master Data is Important


Basic Data for pMRP


Before working on pMRP simulations, we need to make sure that we have basic MRP data active versions.

Make sure that we have the following basic data available:

  1. Material

  2. Bill of Material

  3. Work center

  4. Routing

  5. Production version

  6. Planned Independent Requirements (PIRs)



  • Define Simulation

  • Copy and Simplify Master Data = Reference Plan

  • Create pMRP Simulations


By using New Fiori Apps Schedule pMRP Simulation Creation

With this App, we can schedule pMRP simulations. In order to process simulations, the system creates data based on our operative data for material resource planning. This data is used as reference data in pMRP

  • Process pMRP Simulations


With this App, we can create multiple simulations, check the impact of simulated changes to capacity or demands, and make decisions for our production planning team.

with this app we can also perform Demand Plan Simulation  & Capacity Plan Simulation in each simulation we will have different parameters that can be simulated or adjust accordingly

 

This is a high-level overview of pMRP, and my understanding of the functionality very soon the same will be processed in the HANA 1909 system and will share in detailed knowledge with step by step process

 

Please like and share with others as well.

Thanks & Regards

Ruthvik Chowdary

SME – S/4 HANA Manufacturing & Procurement

SAP Ariba P2P
21 Comments
Labels in this area