Integration of EWM with Repetitive Manufacturing:Part-I

Purpose:

The blog is written to unravel how SAP Extended Warehouse Management in integrated with Repetitive Manufacturing. In this blog, it would be explained what are the key configurations, master data required to having this set up.

Repetitive manufacturing

In repetitive manufacturing,  below  process can be exploited in SAP EWM system

  • Final Confirmation

  • Reporting point confirmation

  • Decoupled confirmation

  • Document-neutral cancellation

  • Document-related cancellation

  • Pull list (material staging list) (MF60)

In this blog, Material staging with EWM(MF60) will be explained. In the latter series of my blog, I will write on all the other process like  Final Confirmation using MFBF and Cancellation processes.

Prerequisites

  •  Business Function LOG_PP_EWM_MAN  must be activated in SFW5

 

  • Configure the required settings in Logistics Execution (LE) –> Integration of Extended Warehouse Management –> Integration of Extended Warehouse Management into PP

The delivery type DOG must have movement type 411 with R3 KEY.

 

  • Activate BC sets in EWM /SCWM/DLV_TRANSFER_PS_ORDER: Transfer posting of pick parts and release order parts

Help.sap provides the list of customizing settings for production supply for integration SAP PP with  SAP EWM.

https://help.sap.com/viewer/f41048b9ca054326bb9774db1d46e866/7.0/en-US/750a20d655af426fb07e39aac870f27e.html

 

Material Staging (with EWM):

Below are the staging characteristics with organizational structure

  •  Material is release order parts.
  • The source storage location is EWM-managed(AFS, Available for Sale.)
  • The destination storage location (production storage location) must be MM-IM-managed.(IM01) 
  • Stock Transfer in 1 Step.

 

Master data required.

  • Create Control cycle LPK1 of BOM components

The source storage location must be EWM managed from where staging happens(411). In my case, it is AFS.

The destination storage location must be MM-IM managed from where backflush(261) will happen . In my case, it is IM01.

The material staging indicator should be equal to 3( Release order part) 

 

  • Create a Supply Areal with IM managed storage location PK05.

 

  • Create Bill of material CS01 and in components assign the production storage location IM01 and assign Production Supply 1001001.

 

  •  Create a Rate routing CA21

 

  •  Create Production Version C223 as it is mandatory to work with PV in Repetitive manufacturing. Assign the BOM and rate routing in Production version and assign the issue storage location IM01 in PV.

 

  • Material master of Header material must have below assignments in MRP View-IV. SAP suggests to use REM profile 0001.

 

  • Create Product cost collector KKF6N else you will not be able to post confirmation with MFBF

 

Process Flow of Material Staging via MF60 for release order parts with 1 source EWM managed location  and 1 IM as destination storage location.

 

 

  • Create PIR in MD61 for Header material ans run MRP. The forecasts can be seen in MD04.

 

  • Run MRP.

 

  • MRP run in Repetitive manufacturing creates Run schedule Planned(PE) order which is in-convertible to Production Order. Staging in Repetitive manufacturing happens from Planned order directly

Note:Technically speaking, run schedule quantities are created as planned orders. The system creates this type of planned order if you have set the repetitive manufacturing indicator in the material master record and created a production version for the material.
As opposed to other planned orders, run schedule quantities must not be released and converted
into production orders

 

In planned order, you must MM-IM managed storage location and production version.

 

  • Conduct Material Staging Via MF60 with reference to planned order. The storage location level must be set else we get a blank screen in MF60. Enter the planned order as well

It gives an overview of the process from the calculation of missing parts to the creation of replenishment
elements.

 

  • The MF60 screen shows how much Quantity must be staged from EWM storage location AFS to IM managed IM01 storage location

 

On saving, system creates an outbound delivery which can be seen in VL06O

 

  • On saving MF60, delivery is created and it is distributed to EWM system. The delivery is having 411 movement type.

 

 

 

  • Check the distributed delivery in /SCWM/PRDO

 

It is important to check the document type and item types which has created the Warehouse request. This data is fetched from below configuration.

 

  • Handshaking of ERP delivery with EWM delivery via Code of Initiator of Communication Chain

 

 

  • Create Warehouse Task and Post Goods Issue.

 

  • Check the ERP delivery status. The goods movement is posted and component is successfully staged to IM managed storage location IM01.

 

 

  • Check the staged component in MMBE. Component is successfully transfer posted to IM01 storage location.

 

Hence the blog ends here. The process explains whole set up material staging of Release order parts from EWM managed storage location to IM managed storage location.

In the next blog, which would be sequel of this, I would write how final confirmation MFBF can be conducted from IM managed storage location with document neutral cancellation.

 

Appreciate your suggestions and reply to make this blog more productive.

 

Best regards

Shailesh Mishra

 

References:

https://help.sap.com/doc/saphelp_ewm94/9.4/en-US/50/7773ffabe84093b649e814d550213b/content.htm?no_cache=true

https://help.sap.com/doc/saphelp_ewm94/9.4/en-US/97/e2ff13b2ac4870985398054353c15c/content.htm?no_cache=true

Assigned Tags

      4 Comments
      You must be Logged on to comment or reply to a post.
      Author's profile photo Mehmet Ozgur Unal
      Mehmet Ozgur Unal

      Hi shailesh mishra ,

      Have a nice blog, it is well explained for integration.

      Waiting for Discrete Production.

      Brgds

      M.Ozgur Unal

      Author's profile photo Caio Castro
      Caio Castro

      Hi @shailesh.mishra5,

      How are you?

      I tried to follow the steps you described but in MF60 my planned orders are not being considered.

      I noticed some differences in my system:

      • I am not able to assign the storage location and supply area at BOM level. The fields are not available.
      • Even assigning the supply area at Work Center and Material master the planned order item still does not have the supply area assigned.

      Do you have any thoughts on what I may be missing?

      Regards,

      Caio

      Author's profile photo Chintan Dhande
      Chintan Dhande

      Hi shailesh ,

      could you please have a look on my issue : -

      I am setting up IRM Inbound delivery process where MFBF is used to create Inbound delivery for finished product.

      https://answers.sap.com/questions/13660347/ppf-scwmprd-in-post-gr-on-save-does-not-trigger-qu.html

       

      Author's profile photo Shaik Taher
      Shaik Taher

      Hi Shailesh,

      Was there any blog posted as sequel for this?

      I was looking for some blog on final confirmation with MFBF related to repetitive Mfg. If you have any references, please share.

      Regards,

      Taher