Variant Configuration ( VC ) In Assembly Processing of Network / Project

This Blog will cover how Variant Configuration will integrate with Assembly Processing of Network/Project with necessary steps.

Business Requirement:

  • One Material has different Characteristics to Sell and depend upon the characteristics of Material; Operative Network Activity Should be selected.
  • The created Operative Network Creation will help for evaluation purpose by Scheduling, cost, Milestone etc. Assignment as well for user time saving / avoiding mistake.

Constrained:

  • As per SAP Standard behavior; assignment of one material to multiple standard networks is not possible in CN08.

Solution :

To achieve this ; Variant Configuration for Network is the Only Way.

In PS; Only Network is Configurable Object.

Prerequisites

  1. Characteristics for Material / Standard Network
  2. Class for Material /Standard Network
  3. Characteristics Assignment in Class for Material / Standard Network
  4. Standard Network Creation
  5. Configurable Material Creation
  6. Configuration Profile for Material and Standard Network
  7. Object Dependency ( Global / Local ) Creation

 

  1. Characteristics for Material / Standard Network – CT04

Characteristics Like;  Type Of Material, Category of Material, Special Procurement.

 

  • We can create number of Characteristics as per business need.

 

  1. Class for Material /Standard Network – CL01

3. Characteristics Assignment in Class for Material / Standard Network – CL02

4. Master/Standard Network Creation – CN01

5. Configurable Material Creation – MM01/MM02

6.Configuration Profile for Material – CU41

 

 

  1. Object Dependency ( Global / Local ) Creation

Will be creating Local Dependency in CN02.

 

  • Note: Local dependencies are created for one object ( In this case its Network – XXXXX )  and can only be used with this object.

 

  • Means; Activity – A3 will be assigning if all above condition / characteristics are matched.

In Requirement class; Configuration Mandatory must need to enable.

 

 All required setting must be in place for Assembly Processing.

 

Demo:

  1. Create the Sales Order

2. Assign require characteristics to material

3. check the created network

  • Characteristics from Material is transferred to Network, as below image.

 

 

  • Check the Operative Network Activity as below ;

 

Please, let me know if anyone have doubt or I missed something.

Your suggestions are most welcome.

Thanks,

Akash Khandelwal

 

 

 

 

Assigned Tags

      2 Comments
      You must be Logged on to comment or reply to a post.
      Author's profile photo BALASUBRAMANIAN AP
      BALASUBRAMANIAN AP

      Good & valuable  blog..

      Author's profile photo mona Gamal
      mona Gamal

      Perfect and Valuable