Skip to Content
Technical Articles
Author's profile photo Peter Wurst

Transporting new Output Control Requirement Routines

When maintaining new Output Requirement Routines in transaction VOFM a new include is generated and automatically added to a transport.  Unfortunately there is a long standing bug where the include is added to include RV61BNNN, where all of the Output Requirement Routines are included, but no transport is generated for this include.

Solution

The solution is to add the report manually to a transport.  Open the transport and click change and insert object LIMU-REPS-RV61BNNN.

Above is a screenshot of a transport with report RV61BNNN manually added.

Assigned Tags

      1 Comment
      You must be Logged on to comment or reply to a post.
      Author's profile photo Noriko Abe
      Noriko Abe

      You can run regeneration program RV80HGEN without creating a new transport. Please see note 28683 - PERFORM_NOT_FOUND: VOFM routine is not active - SAP ONE Support Launchpad