CEWB is a very powerful transaction as far as the manufacturing master data is concerned. This is mainly used as a tool to change/update the values of the BOM and Routing in mass. This is a hidden transaction and needs to be set up using simple configuration steps

SAP may provide pre-defined Work areas which should usually satisfy the requirement. You may also create your own work Areas to have simplified views as per one’s requirements.

In customizing, Go to Production – > Basic Data – > Engineering Workbench – > Edit Working Areas

 

Here it can be seen that Work areas have been maintained for Header level and Item level for both BOM’s as well as Routings

 

 

BOM Header selection parameters

 

 

BOM Item level selection parameters

Similarly Work area is set up for Routing data

 

In transaction CEWB, the maintained Working areas can be seen

Choose any one of the Working area. In this example let us choose the BOM item Working area

The date in the Selection Range is a key factor in determining the BOMs that are active in that period

Since this example is to use the transaction as an extraction tool, we can limit our input to PLANT, USAGE and BOM CATEGORY.

 

A – BOM Header Material

B – BOM number

C – Alternative BOM number

D – BOM item/component material code

E – BOM component description

To export the complete list of BOM in to an Excel file Go to ITEM in the menu and select print. This will load the complete list as shown below. Using the CHANGE LAYOUT option, we can choose up to 99 fields from a list of about 200 fields.

 

Choose Export from List menu to the desired output file.

 

This is one of the easiest ways to extract the Bill Of Materials and Routing data. One can extract both Header and Item view individually or combined.This could be handy in Roll out projects, Migration projects etc. Instead of using extensive master data extraction tools this method can be used whose out put data is self validated as the data fetched is with respect to the validity and status.

Hope this was useful..

 

Thank you!!

Feedback will be appreciated..

 

Regards

Pradeep

Assigned Tags

      4 Comments
      You must be Logged on to comment or reply to a post.
      Author's profile photo Vignesh Veerasamy
      Vignesh Veerasamy

      Great Blog.Informative.

      Author's profile photo Tom Jull
      Tom Jull

      Thanks, Pradeep.

      I have found that properly trained users prefer using CEWB to CS20 for BOM "mass change" because it gives them a better sense of control over what they are changing, although you can change (paste) new values in only one screen page at a time.

      Another tip for routings.  By default, the system will only give you the group number and not the assigned materials on the overview screen.  Via the menu, select "Task Lists >> Material - Task List Assignments" to include the material numbers that are assigned to the respective routing groups/counters.

       

      Regards,

      Tom

      Author's profile photo Pradeep Ramamoorthy
      Pradeep Ramamoorthy
      Blog Post Author

      Thank you for your comments Tom.

      Yes, there are a few menu options which can be used as per our requirement.

      Regards

      Pradeep

      Author's profile photo Victor Cuevas
      Victor Cuevas

      I use it for data extracts for now until we built out the HANA reporting.  I would like to properly use the mass update functionality.  Anyone know of any training sites or consultants who know how to properly use this transaction?  You can email me here or at victor.cuevasii@abbott.com.