Skip to Content

ever wondered why you, as a maintenance planner,  have not sufficient support in repetitive work when you plan a work order?

  • You want to order non stock item from the same supplier but with different content?
  • You did a mistake and allocated the component to the wrong operation
  • You want to copy a whole operation with all the details and then slightly change these details

all these small things are sometimes annoying and provide very poor user experience for data entry.

Now thanks to the Customer Connection program you are able to

  • Copy Component
  • Reassign an component to another operation
  • Copy one or multiple operation

 

this solution will be available in S/4 HANA  as well as in EHP8 SP10 and EHP7 SP16.

 

More details you find in Innovation Discovery Her you will find

  • documentation
  • screen shots to get a glimpse of idea how the solution looks like

 

the Note 2551409 is available for download

 

For the Web User Interface within the order we added this functionality as well.

 

  • Component Overview
  • Reassign material

 

we hope that you find this functionality helpful

 

Stephan Bantlin

To report this post you need to login first.

2 Comments

You must be Logged on to comment or reply to a post.

Leave a Reply