Kanban Process in S/4 HANA 1709

 

Table of Contents

  1. Create Production Supply area using T Code PK05
  2. Create finished product using T Code MM01
  3. Create semi-finished material for which the Kanban process in house, using T Code MM01
  4. Create semi-finished material for which the Kanban process External, using T Code MM01
  5. Extend both the semi-finished materials for production storage location, using T Code MM01
  6. Create info record for semi-finished, material with Ext Procurement T Code ME11
  7. Create status sequence for Kanban
  8. Create Replenishment strategies
  9. Create control cycle using T Code PK01

Process steps for KANBAN

  1. Set the Kanban to EMPTY and FULL by using T Code PK13N and PK12N
  2. Create PIR of finished product using T Code MD61
  3. Run the MRP, for the FG using T Code MD02
  4. Convert Planed order to Production Order (MD04) and confirm (CO11N) for finished product
  5. GR for the Production Order (Due to no Auto GR) (T Code: MIGO
  6. Check the stock overview using T Code MMBE.

Kanban Process in S/4 HANA 1709

KANBAN is one of the easiest & simple method for controlling Production and material flow, based on the actual stock quantity required in production. Material that is required on a regular basis is continually provided in small quantities in production. Replenishment or the production of a material is only triggered when a higher production level actually requires the material. This replenishment is triggered directly in production using properly maintained master data.

1. Create Production supply area using T Code PK05

Enter the Plant and continue

Select new entries, Enter Plant, supply area, storage location and person responsible
Save the production supply area

2. Create Finished Product using T Code MM01

Enter planning strategy as 10 (make to stock) and availability check as Y2, ..etc save the material.

3. Create Semi-finished Material, with Kanban Process in house, using T Code MM01

Enter storage location for EP (where the material will be stored after its procurement), Default supply area (From where the material will get utilized for production) and production storage location (Storage location assigned to supply area) and save the material.
Also, maintain the necessary Master data, Like BOM, Routing & Production Version, etc

4. Create semi-finished material, with Kanban Process External Proc. using T Code MM01

Enter storage location for EP (where the material will be stored after its procurement), Default supply area (From where the material will get utilized for production) and production storage location (Storage location assigned to supply area) and save the material

5. Extend both the Semi-finished materials for production storage locations, using T Code MM01

Here enter the storage location as production storage location and enter, system will extend the material for production storage location also, save both the materials

Extend to the respective Storage Locations…

6. Create info record for semi-finished, material with External Proc. T Code ME11

Enter Vendor, Material, Plant and Purchasing organization.
Here in organization data tab, enter planed delivery time, purchasing group, standard quantity and net price then save the record.

Also Create the Scheduling Agreement for this externally procured Material, in combination with the Plant & the Vendor (T code: ME31L) (This depends on the Strategy, that was selected)

7. Create status sequence for Kanban

Here select ‘New entries’ for creating the new Sequence, if required.

Enter the required indicator which specifies the following for the status (e.g.EMPTY) in the corresponding status sequence:
Whether it is mandatory +
Whether it is recommended *
Whether it is optional.
Whether it is prohibited –
Save the status sequence.

8. Create Replenishment Strategy

A. Create in house replenishment strategy

Here enter plant and replenishment strategy.
Select the control type as ‘working with Planned Orders’

As we are producing with the Planned Orders, then make sure all the REM Settings are maintained for the In house Production Material ( REM Profile, Production versions, Product Cost Collector, should all these settings need to be maintained for the smooth production)
Enter require goods movement for goods receipt, in this case 101
And planed orders as ‘No planed orders’ and save the strategy

B. Create in External Procurement Replenishment Strategy

Enter Plant and Strategy

Enter control type as ‘working with Scheduling Agreements’ and order type as ‘LP’
Enter goods movement for goods receipt as 101 and save the replenishment strategy

9.Create control cycle using T Code PK01

A. Create control cycle for in- house Kanban process
Enter material plant and supply area and select ‘classic Kanban’

Enter number of Kanban (containers), maximum empty and Kanban quantity.
Enter in-house production replenishment strategy and person responsible

On flow control tab, enter the status sequence and save the control cycle

 

B. Create control cycle for external procurement Kanban process: (T code: PK01)

Enter number of Kanban (containers), maximum empty and Kanban quantity.
Enter external procurement replenishment strategy, Purchasing org and Vendor for external procurement.

Process steps for KANBAN

1. Set the Kanban Statuses to EMPTY and FULL by using T Code PK13N and PK12N

Enter plant, production supply area, person responsible and Material, and Enter

A. Kanban for In- house Production

Select first cycle and the Kanban container, select ‘To EMPTY’ tab

System will change the status of Kanban container from full to empty (color will change from green to red)

Now double click on the Kanban container, here the system will show display the planned order that got generated for in-house production of material (KANSFG1)

The same can be seen from the Stock & Requirements List (T code : MD04)

Execution/further processing of this Planned Order can be done from the KANBAN Board

By updating the Proper statuses at the Supply Source & Demand Source (PK12N & PK13N)
Status update/sequence to be followed are as follows:

EMPTY>>> (at the Demand Source)
EMPTY >>> In Process >>> In Transit (at the Supply Source)
In Transit >>> Full (at the Demand Source)

Status changes to In Process

Next Status, need to update to Transit

Status changes to Transit

Now at the Demand Source, Status needs to be updated from Transit to FULL.

Status will get updated to FULL.

Now, the Planned Order at MD04, will get disappeared & the Stock will get updated ( in MMBE)

B. Kanban for External Procurement

Select the Kanban cycle and container and set status as empty by selecting ‘To Empty’ tab

Now, let us start, process the procurement t through KANBAN.

Once the status is changed to empty (Red color), system will generate the Schedule Line for procurement from vendor.

Just double click on the KANBAN ID: 16, you can see the details of the Procurement

Same procurement details will appear in MD04: Stocks & Requirements List

Now go to ‘supply source overview’ using T Code PK12N,
Enter person responsible, plant and vendor and enter

Select the Kanban cycle and container and select ‘status in transit’ tab.

Select the Kanban cycle and container and select ‘status in Process’ tab.

The status will get changed from ‘EMPTY’ to ‘IN PROCESS’ (from red color to yellow)

Select the Kanban cycle and container and select ‘status in Transit’ tab.

The status will get changed from ‘In Process’ to ‘IN Transit’ (from Light Yellow color to Dark Yellow)

Now again go to Demand Source overview using T Code PK13N.
Select the cycle and container and change the status to ‘FULL’ by selecting

To full’ tab, this will trigger the goods receipt of material from vendor (yellow color to green)

By double clicking on Kanban container the material and accounting documents can be checked if necessary

Stock will get updated & Schedule Line from MD04, will get disappeared

2. Create PIR of finished product using T Code MD61

Enter the required  PIRs quantity on desired date and save the PIR

3. Run the MRP, for the FG using T Code MD02

Go to stock/requirement list using T Code MD04 and check the order report.

4. Convert Planed order to Production Order in  (MD04)  and Confirm( CO15), FG

Convert the planed order to production order, and save

Go to the Change Mode of the Production Order & Release, then save (T code: CO02)

Do the Goods Issue to the Production Order (T code: MIGO)

Confirm the Production Order: T code: CO15

5. GR for the Production Order (Due to no Auto GR) (T Code: MIGO)

6. Check the stock overview using T Code MMBE

Finished material stock will get updated in unrestricted use stock at the given storage location

********’
COMMON Issues

KANBAN with ERROR Status:

By any chance, if the KANBAN was updated with the ERROR Status, how to Reset /Revert back to the earlier Status?

Status Reset/Revert back to the earlier status can be done using the T code: PK31

<<<< END  >>>

Kindly update with your valuable inputs, to for any changes/additions required, to make it the most useful document.

Thanks & Regards : Raja Sekhara Reddy Bannuru.

Assigned Tags

      20 Comments
      You must be Logged on to comment or reply to a post.
      Author's profile photo Mangesh Patil
      Mangesh Patil

      Hi Raja,

      Thanks for sharing!

      Very detail and a nice document.

      Keep posting 🙂

      Best Regards,

      Mangesh

       

      Author's profile photo RAJA SEKHARA REDDY BANNURU
      RAJA SEKHARA REDDY BANNURU
      Blog Post Author

       

      Hi Mangesh,

      Many Thanks for your quick feedback & Great Encouragement.

      Best Regards : Raja

      Author's profile photo Former Member
      Former Member

      Hi Raja,

       

      Detailed document, thanks for sharing.

       

      Prem.

      Author's profile photo Santhosh Surata
      Santhosh Surata

      Hi Raja ,

      Thanks for the wonderful document, really helpful .

      Regards ,

      Santosh Surata

      Author's profile photo RAJA SEKHARA REDDY BANNURU
      RAJA SEKHARA REDDY BANNURU
      Blog Post Author

       

      Hi Santhosh,

      Many Thanks for the kind feedback & the positive comments
      Best Regards : Raja

      Author's profile photo Itelligence Project1
      Itelligence Project1

      Nice information and very detailed document

      Author's profile photo kumar semmalai
      kumar semmalai

      Very useful Document. I just learned it 🙂  Thanks a lot for sharing..

       

      Author's profile photo RAJA SEKHARA REDDY BANNURU
      RAJA SEKHARA REDDY BANNURU
      Blog Post Author

      Hi Kumar,

      Thanks A Lot, for the kind feedback. Best Regards : Raja

      Author's profile photo Raghavendra Nookala
      Raghavendra Nookala

      Raja,

       

      Awesome document written with an impeccable detail. Thank you very much for sharing this document. Great job.

       

      Regards

      Raghav

      Author's profile photo RAJA SEKHARA REDDY BANNURU
      RAJA SEKHARA REDDY BANNURU
      Blog Post Author

      Hi Raghav,

      Many Thanks for your Good Words & Great Encouragement.
      Best Regards : Raja

      Author's profile photo Jayanta Chakraborty
      Jayanta Chakraborty

      Nice docs...good one.

      1. Have you or anyone worked on Summarized JIT call? If yes, can you provide stepwise details from setting communication with the external vendor is concerned.
      2. What is the utility of Supply Source view 'replenishment' option?

      Thanks & regards,

      JC

      Author's profile photo Ulhas K
      Ulhas K

      Very Informative Document...

      Author's profile photo Gunnar Humpert
      Gunnar Humpert

      Very detailed and nice documentation. Thank you for sharing.

      Just a small comment. You are creating the control cycle with PK01. This has been replaced by PKMC. PK01 doesn't have all the new fields, and with PKMC, you can also do things like mass change of control cycles, create event-driven control cycles etc.

      Author's profile photo RAJA SEKHARA REDDY BANNURU
      RAJA SEKHARA REDDY BANNURU
      Blog Post Author

      Hi,

      Thanks for the kind feedback & comments.
      Sure, will update the documents as mentioned above.

      Thanks & Regards : Raja

      Author's profile photo Rajesh Tiwari
      Rajesh Tiwari

       

      Hello Raja,

       

      These documents are very good and elaborative for configuration and execution.

      S/4 HANA and classic Kanban has few differences, Do you have to track it, Could you please share.

       

      Author's profile photo Avinash Dondapaty
      Avinash Dondapaty

      sir can u provide plz u r number i will take pp online classes from u ,,,,plzzzz sir

      Author's profile photo Dhiraj Dua
      Dhiraj Dua

      Hi Raja,

      Excellent Document. I also try to create similar scenario in Demo System. Is it necessary to create storage Location based MRP Area for KANSFG2, to create control cycle. Can you help me out regarding this.

       

      Regards,

      Dhiraj

      Author's profile photo RAJA SEKHARA REDDY BANNURU
      RAJA SEKHARA REDDY BANNURU
      Blog Post Author

      Hi Dhiraj,

      Thanks for your kind feedback .
      For the creation of the Control Cycle, there is no need to create the Storage location based MRP Area. You need to Create & Assign the Supply Area.( Mandatory).
      Kindly Note  >>> Supply Area is different from MRP Area. Hope, this is clear to you now.
      Thanks & Regards : Raja

      Author's profile photo Dhiraj Dua
      Dhiraj Dua

      Hi Raja,

      Thanks for prompt reply. But i get below message without storage location based MRP Area.

      PK192 - STRATEGY NOT ALLOWED FOR STGE LOCATION THAT IS INCLUDED IN PLANNING - PK 192

      DIAGNOSIS

      Only the strategies that specify that material flow is controlled via the kanban and that cause the creation of the replenishment (for example, creation of run schedule quantities or purchase orders) are allowed.

      The strategy is only allowed if the material in the storage location allocated to the supply area has been excluded from the planning run.

      SYSTEM RESPONSE

      PROCEDURE

      Either choose another strategy or assign the material to a storage location MRP area which you then exclude from the planning run by setting the MRP type to ND. If no storage location MRP area exists, you have to create one.

      Author's profile photo Dhiraj Dua
      Dhiraj Dua

      Hi Raja,

      Waiting for your valuable response.

       

      Best Regards,

      Dhiraj Dua