Skip to Content
Hello SCN Technical Members,

During HANA Migration using DMO process, we renamed SAP Netweaver SAP SID to avoid any conflict with existing landscape to run both BW Portal in parallel after migration. First step was to split ABAP+JAVA running on BW 7.01 then renaming ABAP and JAVA SIDs as per technical and business requirements. We captured details steps by step guidelines for helping other member out working on similar scenarios.

Rename of SAP Netweaver SID on HANA
for on-premise SoH/BWoH

/wp-content/uploads/2016/06/1_971742.png

2.PNG3.PNG4.PNG5.PNG6.PNG7.PNG8.PNG9.PNG10.PNG

11.PNG

12.PNG13.PNG14.PNG15.PNG

Start Rename for PAS –

16.PNG

Source SID –

Target SID –

17.PNG

19.PNG

20.PNG

Get new license for renamed SID system.

21.PNG

Thanks for your inputs.

To report this post you need to login first.

1 Comment

You must be Logged on to comment or reply to a post.

  1. Former Member

    Thanks for the useful blog.  Would like to understand the runtime of below tasks for your environment.  (FYI, we have a 400 GB BW 7.3 system on HANA database, being proposed for SID change).

    • Database Instance rename
    • PAS rename

    Any feedback would be appreciated.

    (0) 

Leave a Reply