Skip to Content

Ever tried to log on in Test and Production at the same time, especially under Windows 8?

Easy if you open two (or more) independent Excel session, be either:

1) RUN –> EXCEL /X

/wp-content/uploads/2016/05/9_943328.jpg –> /wp-content/uploads/2016/05/10_943317.jpg

or by

2) click ALT on your key board and hold it and than right-mouse-click on the excel-icon in your task bar.

/wp-content/uploads/2016/05/11_943337.jpg.

If you did it right, you get a popup /wp-content/uploads/2016/05/12_943338.jpg you need to confirm.

Than you can log on into a different IBP system, or just have your big non-IBP-excel-file in a different session, so if one of them crashes the other still remains.

To report this post you need to login first.

Be the first to leave a comment

You must be Logged on to comment or reply to a post.

Leave a Reply