Ever tried to log on in Test and Production at the same time, especially under Windows 8?

Easy if you open two (or more) independent Excel session, be either:

1) RUN –> EXCEL /X

/wp-content/uploads/2016/05/9_943328.jpg –> /wp-content/uploads/2016/05/10_943317.jpg

or by

2) click ALT on your key board and hold it and than right-mouse-click on the excel-icon in your task bar.

/wp-content/uploads/2016/05/11_943337.jpg.

If you did it right, you get a popup /wp-content/uploads/2016/05/12_943338.jpg you need to confirm.

Than you can log on into a different IBP system, or just have your big non-IBP-excel-file in a different session, so if one of them crashes the other still remains.