Applies to Sap Strategy Management 10.0 and 7.5

                  
To modify the frequency of a KPI from code (after creation) is done by typing the command:

SET VARIABLE variables periodicity list

Example: you wanted to change to semester a list of KPIs that were created in cube builder quarterly, for that the following is typed:


SET VARIABLE KPI1_ACT, KPI1_TAR, KPI2_ACT, KPI2_TAR semiannual


The possible recurrence options:

/wp-content/uploads/2015/09/time_783331.png

To report this post you need to login first.

Be the first to leave a comment

You must be Logged on to comment or reply to a post.

Leave a Reply