Skip to Content
Author's profile photo Clark Huang

New Function Adventure: Split Rate Validity

TM 9.3 provides the validity period function in the rate line level.

Function:

1.Start Date and End Date will not appear until Rate Validity Split is checked, and once it is checked can’t be unchecked again

/wp-content/uploads/2015/08/1_772105.png

/wp-content/uploads/2015/08/2_772220.png

2.The rate line item start date and end date shouldn’t exceed that of validity

/wp-content/uploads/2015/08/3_772221.png

3.For the same attributes rate lines, the validity period can’t overlap

/wp-content/uploads/2015/08/4_772274.png

4.Rate line split function

/wp-content/uploads/2015/08/5_772285.png

5. Charge Calculation

/wp-content/uploads/2015/08/6_772286.png

/wp-content/uploads/2015/08/7_772287.png

/wp-content/uploads/2015/08/8_772288.png

Technical:

The validity period in rate lines isn’t the scale. They are additional fields in rate line structure as below.

/wp-content/uploads/2015/08/9_772292.png

The standard calculation method uses the calculation date to query the rate amount.

/wp-content/uploads/2015/08/10_772293.png

/wp-content/uploads/2015/08/11_772294.png

Assigned Tags

      3 Comments
      You must be Logged on to comment or reply to a post.
      Author's profile photo Former Member
      Former Member

      Thanks for sharing!

      Author's profile photo Former Member
      Former Member

      Thanks Clark. Really helpful.

      Author's profile photo Former Member
      Former Member

      Thanks for sharing Clark!