Measurement Document Posting from Production Confirmation (PP/PM-Integration)
Purpose
This step demonstrates how completion confirmations for a production order can influence maintenance measures performed on production resources and tools. This example has been created for a bottling/canning plant. Here, tins are filled with paint. The bottling/canning plant contains a filter press which is recorded as PRT equipment in the task list for material Y-351.The maintenance plan for the PRT equipment contains three performance related maintenance cycles. This means that every time the PRT equipment above is used, different operations are used for the scheduled maintenance plan. In cases of high use this may lead to a change of filter
Data for This Example
Field |
Europe |
Maintenance plan |
40 |
Material |
Y-351 |
Production plant |
1100 |
Order type |
PP01 |
Total quantity |
2000 |
Basic dates – end |
At least four days from now |
SchedType |
Backwards |
Final conf. |
Select |
Yield to conf. |
2000 |
Measuring Point |
10171 |
Control key |
PM01 |
Component |
100-431 |
Requirement quantity |
1 |
IC (Item category) |
L |
Sloc |
0001 |
Work center |
R_1140 |
Order type |
PM01 |
Controlling area |
1000 |
Equipment –IE03
Note – (Prerequisits)
- Equipment should be a PRT
- Equipment used for Production should have PRT view enable
- In PRT View
- Usage Formula should assigned
- Measuring Point & MP which are used for capturing Reading and scheduling are assigned in this Tab of equipment.
- In PRT View
Maintenance Plan – IP03
Note – Before creating MP you should craete Performance Statergy with required Cycles in IP11.
Measuring Point –IK01/02/03
Characteristic used is based on production (Unit- Kg)
Creation a Production Order
Use
To create a completion confirmation containing a measurement document, create and confirm a production order.
Procedure
Menu Path |
Logistics ® Production ® Production control ® Order ® Create® With material |
Transaction Code |
CO01 |
Field |
Data |
Material |
Y-351 |
Production plant |
1100 |
Order type |
PP01 |
|
|
|
|
Field |
Data |
Total quant. |
2000 |
Finish |
At least four days from now |
Scheduling/Type |
Backwards |
Production Order – CO03
Operation
Click “PRT” Button
Confirming the Production Order
Menu Path |
Production Control ® Confirmation ® Enter ® For order. |
Transaction Code |
CO15 |
Field |
Data |
Final conf. |
Select |
Yield to conf. |
2000 |
Result
You have confirmed the order. A measuring point was defined as a production resource in the task list, enabling the SAP system to create a measurement document. This document creates a new call after the maintenance plan has been scheduled.
Displaying the Measurement Document
Use
The starting situation for scheduling of production resources and tools (PRT equipment) is displayed.
Procedure
Menu Path |
From the Plant Maintenance node, choose Management of Technical Objects ® Equipment ®Measurement Documents ® Display |
Transaction Code |
IK13 |
- Measurement document
Field |
Data |
Description |
Measuring Point |
10171 |
The measuring point is stored in the maintenance plan. |
Date to |
Today’s date |
|
- .
You see a list of existing measurement documents.
- GotoMeasurement document.
This screen allows you to check the data in the completion confirmation for the order.
Ik13
F4
F8
++++++++++++++++++++The End++++++++++++++++++++
Thanks Sunil
Hi,
What if my product can work on 3 equipments?
I'll add the 3 to PRT Routing
But during Confirmation, it is either one of the three. How do I select the actual PRT that is being used?
Hi,Sunil:
When the confirmation is cancelled, the "Measurement Reading/Total Counter Reading" is not correct .
How to update this filed to correct value in the measure document?
thanks.
After several days of trial, I would like to add one tiny, but very important information:
Make sure that the PRT Control key Settings (Production>Production Control>Master Data>PRT>Define PRT Contorl Key)
have the setting "confirmation" flagged !
regards
Michael