Since its release 9.1 SAP Transportation Management comes with the feature of Load Planning inclduing a 3-D visualization. The pretty need function has been enhanced with TM 9.3 to enable our users to customize the look and feel and also the available information and object functions.

When entering the Transportation Cockpit, you use a page layout to define which objects in which manner you want to see. Here it is now possible for the Order Details Area including the Load Plan to set a specific Load Plan layout.

MKS48_01_TC_Layout.jpg

This LPV layout is defined in the TM customizing here:

MKS48_02_IMG_Path.jpg

The layout includes some basic settings like the thresholds for the axle limits.

MKS48_03_LP_Layout.jpg

As subdefinitions, it is possible to specify colors, additional texts and also the available context menus.

MKS48_04_LP_Colors.jpg

There is a set of predelivered colors available (SAP*), which are tested considering accesibility aspects, but it is also possible to define own colors (see same customizing path). In addition, you can define if the color shall be available in the legend.

The standard looks like this (blue for loaded items, red for not loaded items, orange for medium axle load).

MKS48_05_Cockpit.jpg

Now having the colors slightly adjusted:

MKS48_06_Cockpit.jpg

Check out the feature of adjusting the additonal object details and the context menu functions also. Maybe I spend the next MKS on this also.

To report this post you need to login first.

3 Comments

You must be Logged on to comment or reply to a post.

  1. Murugesh Karunamurthy

    Is there a strategy which can unassign the FU that cannot be loaded into the the FOR.

    In addition if a FU is partially loaded then split the FU and keep it unplanned.
    Ideally if the load planning results were considered during FOR creation it would be better, is this possible ?

    (0) 
    1. Marcus Zahn Post author

      Hi,

      currently it is only possible manually within the Transportation Cockpit. I take it as a continous improvement item to make it available as automatic LP function.

      Sure, it would be better to consider Load Planning during FOR planning/creation. Nevertheless, this blows up the optimization problem. Nevertheless, there are some tricks for an end-to-end planning scenario starting with the Forwarding Order, creating Freight Units (including pallet information), planning based on those pallets and then creating the load plan.

      Marcus