Skip to Content

After you’ve created the SEA project the application switches over to the maintenance optimizer (MOPZ). This upcoming MOPZ transaction has to be finished including step 3 (download files) to get a proper result in SEA. In MOPZ the transaction can the saved, closed and continued later.

Withdrawing a MOPZ transaction terminates the corresponding SEA project. You have to start from scratch here (create a project, switch to mopz and execute the corresponding analysis). Another mopz transaction can’t be assigned to a running SEA project. You can either delete this project (my suggestion) or leave it as it is.

To report this post you need to login first.

Be the first to leave a comment

You must be Logged on to comment or reply to a post.

Leave a Reply