Skip to Content

Procedure to Generate the OT on Normal Days, Sunday and Public Holiday.

Overview


Business Scenario:

1.    Generate OT on Normal days

2.    Generate OT on Sundays

3.    Generate OT on Public Holidays.

4.    Generate OT on Public Holidays which Falls on Sunday


Configuration Steps:


Time Management –> Time Evaluation –> Time Evaluation with /Without Clock Times / Time Wage Type selection and Overtime Compensation –> Define Generation Rules


View: V_T510S       

Over Time on Normal Days

Untitled.png

Over Time on Sundays


Untitled.png

Over Time on Public Holidays on a Working Days


Untitled.png

Over Time on Public Holidays falls on Sundays



Untitled.png

PCR – T Code: PE02

Copied Standard PCR MODT from ZMDT


Untitled.png

Schema Setting

T Code – PE01

Copied standard Schema TM00 from ZOTA

Untitled.png

Time Evaluation

T Code – PT60


Untitled.png

After running PT60 successfully, Generation of OT on Normal Days, Sundays, Public Holidays, Public Holidays falls on Sundays.

Log – Time Evaluation

  1. OT on Normal Days (i.e., on 03.10.2013 (Thursday))

Untitled.png

Untitled.png

Untitled.png

Untitled.png


2.     OT on Sundays (i.e., on 06.10.2013 (Sunday))


Untitled.png

Untitled.png


Untitled.png

Untitled.png

3.     OT on Public Holidays on a Working Day (i.e., on 14.10.2013 (Monday))


Untitled.png


     Untitled.png


Untitled.png

Untitled.png


4.      OT on Public Holidays falls on Sundays (i.e., 13.10.2013 (Sunday))


Untitled.png


Untitled.png


Untitled.png

Untitled.png


View in PA30


Master Data Entry for Clock-in and Clock-out through Infotype 2011 (Time Events)


Untitled.png



To report this post you need to login first.

Be the first to leave a comment

You must be Logged on to comment or reply to a post.

Leave a Reply