Skip to Content

How to Migrate from Classical BPMon to BPMon on MAI

With Solution Manager Release ST7.1 SP12 it is possible to use the Monitoring and Alerting Infrastructure (MAI) for the Business Process Operations (BPO) use cases.

A Wiki is now available which describes in a detailed way the steps to migrate a solution to MAI:

Migration from classic BPMon to BPMon on MAI – Solution Manager – SCN Wiki

Be the first to leave a comment
You must be Logged on to comment or reply to a post.