Skip to Content

With Solution Manager Release ST7.1 SP12 it is possible to use the Monitoring and Alerting Infrastructure (MAI) for the Business Process Operations (BPO) use cases.

A Wiki is now available which describes in a detailed way the steps to migrate a solution to MAI:

Migration from classic BPMon to BPMon on MAI – Solution Manager – SCN Wiki

To report this post you need to login first.

Be the first to leave a comment

You must be Logged on to comment or reply to a post.

Leave a Reply