Skip to Content
Author's profile photo Dolores Correa

First steps to work with Change Request Management scenario in Solution Manager 7.1

 

NEWS: Content of this SCN doc will be maintained now in wiki page https://wiki.scn.sap.com/wiki/x/GoqrGg

 

 

 

With the following steps you will be able to create a test landscape to practice with the Change Request Management ChaRM scenario in Solution Manager 7.1 without creating interferences with real TMS landscapes.

Also I will try to give tips and tricks for the common mistakes in the configuration of this scenario.

 

The configurations given are valid for Solution Manager 7.1.

 

Configurations on Managed Systems

 

1- Create the test landscape in TMS

 

Usually you would like to use ChaRM to manage the changes in this kind of system landscapes:

DEV:100 -> QUA:200 -> PRD:300

 

The test landscape that I am proposing is this one: your Solution Manager is installed in system SMM for example, and you are configuring client 001 for being used as ChaRM client, them SMM:001 is your ChaRM client.

 

Create three additional clients in SMM, like local client copy from client 000 with SAP_ALL profile (this will need some extra space in SMM system, but not too much), let say you create clients 100, 200 and 300.

 

We assume that SMM:100 is going to be the Development system, SMM:200 the Quality system and SMM:300 is the Production system.

In SCC4 assign the following client settings, roles, etc. to these clients.

1.PNG

Customizing role for SMM client 100, Test role for SMM:200 and Production role for SMM:300.

The indications given for this test case from now on also apply to for your real TMS landscape, to DEV, QUA and PRD system.

Create the logical systems in the managed systems, in transaction SALE -> Basic Settings ->Logic System -> Define Logical System & Assign Logical System to Client -> Save

2.PNG

3.PNG

4.PNG
2- Configuration of TMS for this scenario according to ChaRM prerequisites
Key points

Transports are supported in the standard transport layer of each client. When you configure transport routes, note that only consolidation routes that are assign the standard transport layer of the relevant exporting client are taken into consideration.

For each exporting client, exactly one target client and one target group are permitted.

We recommend that you assign exactly one development system to a production system, and that these two systems are connected by exactly one unique transport track.

If a development system and a production system are connected by more than one transport track, this may lead to inconsistencies within the transport distribution. This type of transport configuration cannot be supported by Change Request Management, and may cause inconsistencies within the tools involved.
In Solution Manager, in client 000, call STMS (the TMS configuration should be done in the domain controller system of your real TMS managed landscape). In our example, SMM is the only system and so it is the domain controller.

 

 

Configure transport routes and transport strategy

5.PNG

Note: SMM client 001 does not need to take part of your TMS landscape.

 

Select Transport Routes icon:

6.PNG

For this test landscape initially you have system SMM and none transport route defined (for a real landscape you will have the three system boxes DEV, QUA and PRD and the transport routes already defined). Make double-click on system SMM and fill the following values (or in the box of the development
system).

In System Attributes tab: the use of Single transport is a prerequisite for ChaRM for all the systems in the landscape:

7.PNG

Note: These is a prerequisite for using the ChaRM scenario:

  • Deactivate the quality assurance approval procedure
  • Activate the single transports strategy

Because ChaRM has its own approval procedure, the existing quality assurance approval procedure isn’t needed in TMS. Also, activating the single transports strategy will ensure that the Import All option can’t be executed in the TMS.

 

In Standard Transport Layer tab: ensure you enter the client 100, (client with customizing role for the development box)), you need to configure client-specific transport layer settings for development systems:

/wp-content/uploads/2014/12/7_2_615495.png

Note: Enter the development client number and the transport layer which should be used in ChaRM.
If you have more than one development systems/clients, please make sure for all of the transport layer settings are configured correctly here, otherwise ChaRM may not be able to calculate the transport tracks based on your STMS configurations

 

Consolidation routes:

Create the consolidation transport routes to SMM:200, transport route must be CLIENT SPECIFIC for the use in ChaRM scenario, this is real important!

From development system to quality system you need at least two consolidation routes, SAP and ZXXX.

8.PNG

Go with the pencil from the system SMM to system SMM and get this pop-up:

9antes.PNG
I create the consolidation route for transport layer SAP and I do the same to create transport route for transport layer ZSMM (for customer developments).

 

In case of a real landscape you need to choose from which system and CLIENT to which system and CLIENT, use button Extended Transport Control (F6) to see the client field if you choose create the transport route from Edit->Transport route -> Create option.

Note: You should know that in SAP Solution Manager 7.1 we no longer support “SAP” transport layer, for more information please refer to SAP note 1401611.
Delivery routes:

 

I make the same to create the Delivery transport route from SMM:200 to SMM:300, delivery routes are always from quality to production systems.

10.PNG
Finally you will get the following situation:

11.PNG

Save and distribute the changes:

12.PNG

Note:

All the previous work has to be done in the domain controller systems in real TMS managed landscapes.

The following TMS parameters are required for all systems in the managed landscape:

CTC  1 (Extended Transport Control activated)

IMPORT_SINGLE_ONLY 1

IMPORT_SINGLE_STRATEGY 1

NO_IMPORT_ALL 1

WORKFLOW_STRATEGY 0
Note: CTC must be set to 1 for single ABAP stack systems and dual stack systems; for standalone non-ABAP systems CTC should be set to 0.

 

Preparations on SAP Solution Manager System
1. Review of the main configuration points in Solman system

Before using ChaRM scenario please ensure that you have run in solman_setup the indicated activities.

Especially important points are:

– Sol. Mgr. Central Correction Note is implemented

– Piece List is activated

– LMDB is configured and Ibase components/IObject have been created for the managed systems

– Check Background Jobs: a job for report /TMWFLOW/CMSSYSCOL2 should be running, this job is used to fetch transport data from managed systems.

– Implement ChaRM master note relevant for your system patch level

– Activate ChaRM relevant services

– Set Client for Change Request Management: Please notice that ChaRM can only be configured in one client per Solman system

– Add Contact Person to Business Partners

-Check and Correct Number Ranges

– Copy ChaRM transaction types SMCR, SMMJ, SMHF using copy report

– Create Users and Business Partners, all users working in ChaRM scenario need to have a BP linked to them with employee and contact person role

– Maintain transaction types

– Create ChaRM Template: Users for the different ChaRM roles, admisnitrator, change manager, developer..
2. Check RFC Destinations for managed systems in LMDB
As of SAP Solution Manager 7.1, you can use a new import strategy called Harmonizing RFC communication infrastructure, see note 1384598. It has the following advantages:

  • No named dialog user needed in client 000 is required
  • For imports into the managed system, the RFC destinations created within the managed system configuration are used

If the harmonizing RFC communication infrastructure is not used still you will need to activate TMS Trusted Services and created domain links between the solman and the managed landscape domain controllers, see my KBA 1908411Harmonizing RFC communication infrastructure: how it works.
Change Request Management requires a READ, TMW and TRUSTED RFC to every Managed System/Client.
In order to ensure that Change Request Management works perfectly with Managed Systems a minimum SP Level is required. Please check SAP Note 907768 for further details.
Don´t forget that if harmonizing RFCcommunication infrastructure is in used you don´t need to create a RFC destination to client 000 of the managed systems as before, only to the system:clients entered in the logical component used for your ChaRM project.

Note: For technical reasons for solution manager 7.1 SP08 or lower versions we still require SAP Solution Manager RFC destinations into client 000 of the domain controllers of all linked TMS transport domains, see note 1384598.
In LMDB, in Technical system tab select the system and for Destination entry select RFC Maintenance, here you need to select the client and then create the required RFC connections from the Solman to the managed systems.

13.PNG

For this test scenario you need to select SMM clients 100, 200 and 300 and created the RFC destinations:

14.PNG

Note: Ensure that under RFC for SAP Solution Manager you can see the SM_SIDCLIENTXXX_TRUSTED entered and not the SM_*_LOGIN RFC, this is
really important to avoid further issues.

If you already have a LOGIN connection here then update the trusted connection by selecting option”update XXXX_TRUSTED” from the drop down list of “Trusted System RFC Destination” and click on “Execute”.

 

For a real managed landscape you need to select for example DEV:100, QUA:200 and PRD:300 system,

Later in transaction SMSY you will see:

15.PNG

 

3. Create a logical component

 
You need to create a logical component, one or several, that contains the systems of the real managed landscape, enter in the logical component only the systems that you want to control via ChaRM, it is not required that you create a logical component that contains all the systems in transport routes of the managed landscape.

Logical component can be regarded as a projection of managed system infrastructure into SAP Solution Manager system, so it must represent the real landscape and the system roles should be consistent to their real roles in business scenarios the logical component shows different categories, Development system, Quality System, etc.
Each category, column name, is linked to a type of system role such as source system, target system, production system, etc..

16.PNG

Click on System Roles:

17.PNG

If you are going to customize the categories and add new categories by yourself, please make sure the Type of Role must be consistent to your system role. That is, for development system, the Type of Role should be Source Systems; for test systems, the Type of Role should be Target Systems; forproduction system, the Type of Role should also be Production Systems.
You can also see the Type of role assignment in solar_project_admin, select the project and go to System Landscape tab, System tab, there you will need to
enter the logical component click in System role assignment button and then in System roles.
Details in 1484964 – ChaRM: incorrect systems are checked in /TMWFLOW/CHARMCHK
Note: Change Request Management requires at least two systems in the logical component, one as source system and one under category production system.

 

Depending on the patch level of the Solman 7.1 you need to create the logical component in SMSY (System Groups and Logical Components, Logical components ->Right click on Logical Components -> Create New Logical Components -> Enter name and product information) or in LMDB (select the Logical component tab).

 

You need to put the relevant systems into their corresponding system roles, ensure that the system entered fits with the real TMS landscape that you have.

I mean ensure that there are consolidation routes defined from the source system to the first target system and delivery routes created between target systems and from the last target system to production system.

This will be check during the task list creation, if the systems entered in the logical component are not consistent with the real TMS landscape ChaRM could not be activated for the project and you will receive the usual errors:

  • No exporting system for system
  • No consolidation system found for

4. In Solution Manager go to transaction SOLAR_PROJECT_ADMIN
Decide if your project is an implementation or a Maintenance project. For our test case select a maintenance
project.

Create

18.PNG

Enter Description and Project language and save

19.PNG

/wp-content/uploads/2014/12/19_2_615883.png

Yes.

 

In System Landscape Tab:

– Systems: here you have to enter your logical component

20.PNG

 

 

Select the product of the managed lanscape and select the logical component previously created. Save.

You can have a minimum of two systems, source and production systems, for ChaRM scenario but you can have for example 5 systems with different roles in your real landscape.

Note: until four system landscape is supported in the ChaRM standard scenario, if you have more systems you will need to define some additional status, actions…This is not supported in standard.
In our test case you will have this:

21.PNG

 

Once again, always use here a logical component that fits with the real TMS managed landscape, if not the ChaRM scenario could no be activated. This point is always the point that more problems gives in the activation of ChaRM scenario!!!

ChaRM expects to see consolidation routes from source to target systems, delivery routes between target systems and from the last target system to production system.
– In IMG Projects tab: create always a IMG project in the development system ONLY! You need to define this IMG project in the development system in order to assign to this IMG-CTS project all transport orders that you are going to be created via a Change document in the solman system, this is a prerequisite for ChaRM scenario!
Don’t define IMG projects in other roles, systems, different to the development system.

22.PNG
Select the line and click on first create icon.

23.PNG

Always select `No, later´

24.PNG

Yes: This popup appears if you are creating the IMG project in this particular test scenario, in the same system where ChaRM project is created, select another name for the IMG project:

25.PNG

IMG project is created in SMM:100

26.PNG
Go to Transport Requests tab, here you will see that for an ABAP landscape a CTS project is also created and activated:

27.PNG
Note: use /nspro_admin to see the IMG-CTS projects created in the development managed systems
Click back and go to Change Management tab and activate Change Request Management for your project, select the flag:

28.PNG
Note: for activating ChaRM the user doing this action needs to have a BP with employee and contact person role.

Now run a Check, you cannot run a project check before setting the flag in the Activate Change Request Management.

29.PNG

If you perform a ChaRM check for a correctly activated ChaRM project, you should see all lights are green. Now you can create the task list for the project.

30.PNG
Select Create Task List

31.PNG
Select the name of your Maintenance Cycle

32.PNG
Task list and maintenance cycle document are created.

Click on Show Project Change Cycle, this will open the SMMN document 8000002401 in sm_crm, ensure that the phase is In Development w/o Release, if not move from Created to this phase.

Click in Show Task List for opening task list M*323 in /nSCMA, unlock the project track groups.

Project is ready for working.
You can start the creation of request for change and change documents.

Assigned Tags

      23 Comments
      You must be Logged on to comment or reply to a post.
      Author's profile photo Artem Zhegalin
      Artem Zhegalin

      Hello, Dolores.

      Thank you for one more nice topic on ChaRM 🙂

      BR,

      Artem

      Author's profile photo Former Member
      Former Member

      Your articles are always very complete & helpful.

      Thank to you, our Solution Manager work very well.

      You are charming 🙂

      Author's profile photo Former Member
      Former Member

      Thanks for that good topic about SOLMAN 7.1 ChaRM

      BR,

      Amr

      Author's profile photo Manu Mohandas
      Manu Mohandas

      Good Document .

      Can you add a bit more of detail on  "Preparations on SAP Solution Manager System"

      Thanks ,

      Manu

      Author's profile photo murali reddy
      murali reddy

      Thanks for the nice document

      Just one observation ,in screenshots for client 300 ,client role is shown as customizing ,i guess it should be Production

      one important thing to check is that ibase for Production system of Charm landscape is correctly present in ib51.Sort string should be correct if not Change documents will not get generated

      Regards,

      Murali

      Author's profile photo Dolores Correa
      Dolores Correa
      Blog Post Author

      Hi Murali,

      Yes, you are right, in a real TMS landscape the product system client should be productive.

      Change document needs to be filled with the ibase component, text or object component, of the production system where the changes need to arrive.

      If you are using long system ID (Long-SID) in a logical component of a ChaRM project for this production system, then you must maintain the sort string field in ib52 for the production system, and the value of the sort string must be identical with that product system´s name in LMDB/SMSY.

      Best regards,

      Dolores

      Author's profile photo Steven Hu
      Steven Hu

      Great Document! Thanks for sharing!

      Author's profile photo Former Member
      Former Member

      Thanks Dolores Correa.Very useful document.

      Could you please also give bit more info on "Preparations on SAP Solution Manager System"

      Author's profile photo Former Member
      Former Member

      Thanks for all your documentations all over the years - you're the CHARM Bible.  One thing I can't find, from your previous documentation, SMSY was the reference, now in LMDB, I cannot find the trigger to temporarily inactive a non-working system (7.1 SP11)

      Thanks

      /wp-content/uploads/2015/02/inactive_640409.jpg

      Author's profile photo Dolores Correa
      Dolores Correa
      Blog Post Author

      Hi David,

      See in your screenshot the field Lifecycle status, inactive status can be selected there.

      I think this is the correct point since SP10 to set this flag.

      Best regards,

      Dolores

      Author's profile photo Former Member
      Former Member

      Hi,

      It's really a good document. Very helpful.

      Author's profile photo Satish Arram
      Satish Arram

      Hi Dolores,

      Thanks a ton for the wonderful & detailed post. I have one quick questions. Is there any way to add two approval steps before importing a TR into Production from Quality? As far as I know, after Successfully Test, once Change Manager approves, IT Operator will move changes into production system. Can we add one or two more approvers in SPS10 or later which is restricted by authorization objects?

      Regards,

      Satish

      Author's profile photo Kuthubus Saman
      Kuthubus Saman

      Hi Dolores,

      Thanks for your blogs, through which we have learned a lot in ChaRM & Incident Management.

      Please help me to solve the issue posted in Transport cannot be assigned to Project

      Thanks and Regards,

      Kuthubus Saman

      Author's profile photo Former Member
      Former Member

      Hi Dolores,

      Useful info given about Charm.

      Thanks

      Soundarya

      Author's profile photo Gaurav Rana
      Gaurav Rana

      Hi Dolores,

      Thanks for sharing a wonderful document.Keep posting.

      Regards,

      Author's profile photo amar reddy
      amar reddy

      Hi Dolores,

      Thanks for sharing the wonderful knowledge.

      Regards,

      Amar.

      Author's profile photo Torres Guillermo
      Torres Guillermo

      Hi Dolores,

      Thanks for this helpful post. 🙂

      Regards,

      Guillermo

      Author's profile photo R Rajesh Kumar
      R Rajesh Kumar

      Good and Useful Document    🙂

      Author's profile photo Former Member
      Former Member

      Hello,

      what might be wrong if I don't have the "Change Management" tab in solar_project_admin?

      we are on SP8 7.1

      Kind regards

      Author's profile photo R Rajesh Kumar
      R Rajesh Kumar

      Hi Anon,

      http://scn.sap.com/thread/3355747

      Check this thread

      Author's profile photo Former Member
      Former Member

      Hello Rajesh,

      I could solve the problem already.

      The thing was, that in customizing I missed a configuration.

      step 3 , 2.1

      see First steps to work with Change Request Management scenario in SAP Solution Manager 7.0

      Author's profile photo Ashish Gaurav
      Ashish Gaurav

      Very elaborated and to the point post.

      Keep up the good work.

      Just a suggestion..!!

      You can add what all things we do in solman_setup under the Change Request Management tab. (Not sure if you have added this topic in other post)

      Author's profile photo Former Member
      Former Member

      Hi Dolores,

      Many thanks for your help and support.

      Its a wonderful documentation that helped me to overcome the issue of releasing the project track groups.

      Suggest you to make a note that project should be created in CharM client SMM:001 and the IMG project should be with development client SMM:100 which was a show stopper to my issue.

      PS: Requesting you to include a documentation on how to do a charm functionality test with dummy transport request.

      Regards,

      Viswanathan Subramanian