Technology Blogs by Members
Explore a vibrant mix of technical expertise, industry insights, and tech buzz in member blogs covering SAP products, technology, and events. Get in the mix!
cancel
Showing results for 
Search instead for 
Did you mean: 
TammyPowlas
Active Contributor

This was an SAP webcast.  How to consume BW through HANA Enterprise Cloud and Cloud Lifecycle Management, combining three topics into one session

Figure 1:

Need to replicate data

The SAP Speaker read from the slides so no additional notes from me on this

Figure 2: Source: SAP

HANA Enterprise Cloud is a virtual private cloud with single tenancy infrastructure – it is not public – it is virtual

It is an extension of your corporate network

Three components on the left of Figure 2

Core services are described in roles & responsibilities document

Core services are a technical operation service

Infrastructure and core services are subscription based

IT planning, RDS, application services can be complemented; can be optional on a subscription basis

A technical assessment service is provided (plan, build, run) – how much data BW should have, expected growth, kinds of systems connected

System provisioning is through cloud lifecycle management tool

Core services keeps BW running through SLA’s

Plan depends on customer scenario.  Two use cases – customer relocate BW services or net-new installed BW

Figure 3: Source: SAP

Figure 3 refers to “build phase”

Two flavors of HEC – one flavor is Cloud Start and other is Cloud Productive

They different in SLA and commercial framework

It is up to customer which environment to begin with; depends on contracts signed

Cloud start lasts up to 1 year, weekly subscription

Cloud productive is up to 5 years with monthly subscription

Systems in cloud start have 95% availability; these are for non-productive systems

Systems can shift from cloud start to cloud productive after the contract is signed with higher SLA’s  (for POC’s)

Figure 4: Source: SAP

Switching service starts to Cloud Start to Cloud Productive

Cloud Productive is managed by SAP Core Services

Customers run their BW, leveraged on BW on HANA

Productive system remains your EDW

Service levels in cloud productive – clearly defined infrastructure activities (in roles & responsibilities document)

Availability is 99.5%, 24 x 7 support, defined windows for patching, etc.

Activity reports, remediation, dedicated personal contact, customer engagement manager, technical landscape manager – have customer specific data

recovery architecture

Figure 5: Source: SAP

Cloud lifecycle management tools support two ways – new installation and solution relocation

Simplest is the new installation

Relocation of existing BW solution to HEC- hybrid cloud scenario to connect ERP to BW or other data centers

SAP BW extractors are used to stage extractions

Aspects of WAN connected to ERP are covered during the planning phase

Figure 6: Source: SAP

You can get an empty SAP BW system – SAP BI content is not pre-activated; customer decides which BI content is activated

From pre-assembled RDS packages you can get SAP BW semi-activated BI content

Source system dependent objects would need to be reactivated after you connect to BW


There is an option for a full active BI content RDS; example data is imported for analytic scenarios

Figure 7: Source: SAP

SAP BW solution is relocated; hardware remains in your data centers

Two options – 1 is a system copy to HEC with the database migrated

Use the software provision manager for the system copy

It includes a stack split and Unicode conversion (SUM includes update and database migration)

Figure 8: Source: SAP

Figure 8 shows relocating SAP BW to HEC and uses SUM to and in EC

Relocate SAP solutions to HEC – there is no need to make a copy of on-premise system in the cloud

The original system is using the database migration option (DMO)

The Import phase runs in HEC

Figure 9: Source: SAP

There are two downtimes – less than 48 hours or greater than 48 hours

Managing of downtimes depends on the methods of SAP BW relocation

Copy & SUM in HEC scenario – system downtime can vary

1:1 copy can be performed in different ways – back up and restore or another tool

First scenario – only downtime for the export phase – SAP BW use case – is used to set up sandbox systems. Consider the integration aspects of extraction from ERP – stop batch jobs, relocate BW system, and after export you can restart the extractions to BW system on premise

Second scenario – takes into account business integrity – should be used for productive solutions

Downtime of export to import could be over 48 hours; if BW is big you may require more than 48 hours

As an example, the speaker said 30TB compressed data from non SAP database, moved using MPLS connectivity, accomplished in 1 weekend

Third scenario copy and update for optimizing downtime – set up in ERP systems – delta queue cloning – logical delta queue – achieve 2 short business downtimes

Figure 10: Source: SAP

Solution relocation or new installation, could use SAP RDS and SAP BW to SAP HANA RDS is coming

Question & Answer

Q: Will get details on transfer of data to cloud?

A: No difference to on premise scenario

HEC extends network of customer; no additional tools

Q: How many customers are in HEC who are live?

A: Can’t give detailed numbers.  Most customers are existing BW customers and SAP manages the relocation as described.

UPDATE: I asked steve.lucas2 yesterday on a SAP Chat for customers using BW on HANA in HEC and he said "Bosch, Siemens, 99c stores+++ all using BW on HANA in HEC"

Q: How would users run BEx or BI reports with this hybrid architecture?

A: for the BEX you need BI Java component (?) in HEC

BusinessObjects scenario – have customers run next to BW in HEC or if on premise can run in hybrid mode

Have both scenarios running productively in HEC

Q: For an existing customer what will be the impact of having BW fully activated?  BI content fully activated

A: It is not assumed to provide fully activated BI content for a relocation scenario.  Relocation is system copy or migration to HEC

Q: Would full data reload work the same as on premise architecture?

A: in SAP BW it remains the same

Typically in planning phase you evaluate volume

Q: Is BI Content for all industries supported?

A: new type of BI content model – EDW/Analytical data model, takes into the account LSA++

Industries  - refer to the BI content documentation

Q: Does that mean the data models would have to be redefined from relocation of on-premise system?

A: No the data models stay as-is with the relocation – you can consume BW same and once on HANA DB to take advantage of HANA DB

“relocation without disruption”

3 Comments
Labels in this area