KANBAN with Stock Transfer
- Material Used:
- FERT- Samsung Ace
- ROH- Battery
- ROH- Mobile Case
- Plant: 1000
Perquisite Setting For Kanban Stock Transfer:
- 1. We need to create to storage locations. Assign it to materials by MMSC
KN01- Kanban Storage location (Stock should be excluded from MRP)
MN01- Main Storage location
2. KN01 should be put in MRP2 views of all materials in Production storage
Location of ROH material.
- 3. Create Supply area for supplying storage location MN01 and Reciving storage location KN01. PK05
For KN01 Supply area PRD2 is created
For MN01 Supply area PRD3 is created
- 4. Create Control Cycle. PKMC for Reciving storage location KN01
After clicking on change/display mode you will get creation field
Creating Control cycle for KN01 for material MOBILE CASE
Then save it.
0004- is a Direct posting , No material Reservation will be created for Replinishment
i.e. To EMPTY status
- 5. After that Print Barcode in PK17
- 6. Set Status Empty by scanning barcode in PKBC
Then save it Status will be changed From WAIT—-> EMPTY
If the MN01( Main stores) doesnt have Stock then KANABAN Signal will be failed and it will give error.
Ensure that material is available in Main Stores in MD04
When you change WAIT—->EMPTY
Due to Direct posting 0004 Material is directly posted to KN01
In PK13N View we can see the container number and its indication
Change Status To EMPTY—-> To FULL
Green Light Indication Container is Full.
After That Same procedure done with another child material (BATTERY)
Hope this Document will be helpful..!
Any suggestions are welcome.
Thanks
Prashant
helpful document Prashant, good work 🙂
could you please make it more clear, i have not ran it completely, but i believe it can be in more detail.
Regards
Ravindra kulkarni
Good document Prashant..
Thanks Akshay