Skip to Content
Author's profile photo Keerthi P

In-process inspection in Discrete Manufacturing

Introduction

This document describes the in-process inspection process for discrete manufacturing (Production Order) with sequence of steps including master data needed and transaction data to be executed along with screenshots. This document is intended for QM learners.

Master Data Needed:

  1. a) Material Master – QM View
  2. b) Master inspection characteristic
  3. c) Routing with QM Control Key-MIC Assignment

Transaction Data:

  1. a) Production Order Creation & Release
  2. b) Inspection lot Completion

Master Data Needed:

  1. a) Material Master – QM View (MM01/MM02)

Inspection Type 03 – In-Process insp. for Production Order needs to be activated in the Material Master under QM view – Inspection Setup as shown below.

 
/wp-content/uploads/2014/09/1_542737.jpg

  1. b) Master inspection characteristic (QS21)

          Create Master Inspection characteristic as shown below using transaction code QS21.

/wp-content/uploads/2014/09/2_542744.jpg
Select Characteristic as Quantitative & Status as Released and Complete copy model.

/wp-content/uploads/2014/09/3_542745.jpg

Select lower, upper & target values for characteristic.

/wp-content/uploads/2014/09/4_542746.jpg

Enter the values for the characteristic & Save.

/wp-content/uploads/2014/09/5_542750.jpg

Information is displayed after saving.

  /wp-content/uploads/2014/09/6_542751.jpg

  1. c) Routing with QM Control Key (CA01/CA02)

Select control key PP06 – In-house production with inspect. chars as shown below for the operation. Ensure that the control indicator “Insp.char.required” is active for the control key as shown below.

/wp-content/uploads/2014/09/10_542752.jpg

Select the operation and click on Inspection characteristics button for assigning the mic created.

/wp-content/uploads/2014/09/11_542759.jpg

Enter MIC “Wattage” created as shown below & Save.

  /wp-content/uploads/2014/09/12_542760.jpg

Transaction Data:

a) Production Order Creation & Release (CO01)

/wp-content/uploads/2014/09/13_542761.jpg

Enter Quantity and scheduling details & release the order for triggering the in-process inspection lot. 

/wp-content/uploads/2014/09/14_542762.jpg
Inspection lot is displayed in the assignment tab of the order as shown below.

/wp-content/uploads/2014/09/15_542818.jpg

b) Inspection lot Completion (QA32) – Results Recording & Usage Decision.


Enter Plant and Material and execute the transaction for listing the inspection lots./wp-content/uploads/2014/09/16_542831.jpg


Select the inspection lot line item and click on Results to record the values.

 

/wp-content/uploads/2014/09/17_542832.jpg

Select the characteristic and click on details to enter the value and valuate the same.

/wp-content/uploads/2014/09/18_542833.jpg

Enter Mean Value and on pop-up selection the valuation as accept.

/wp-content/uploads/2014/09/19_542843.jpg

Save the screen.

/wp-content/uploads/2014/09/20_542844.jpg

Information will be displayed upon saving.

/wp-content/uploads/2014/09/21_542845.jpg

Select the inspection lot and click on Usage decision for completion of inspection.

/wp-content/uploads/2014/09/22_542847.jpg

Select the usage decision code as A-Accept.

 
/wp-content/uploads/2014/09/23_542848.jpg

Save the screen.


/wp-content/uploads/2014/09/24_542849.jpg

Information will be displayed upon saving.

/wp-content/uploads/2014/09/25_542850.jpg

Assigned Tags

      2 Comments
      You must be Logged on to comment or reply to a post.
      Author's profile photo Gajesh Nagesh
      Gajesh Nagesh

      Dear Keerthi,

      Good document. As a next part to this you should mention the controls which one can use when using Inprocess inspection. May be this link can help you

      http://scn.sap.com/thread/1559735

      Hope to see more documents

      Regards

      Gajesh

      Author's profile photo Keerthi P
      Keerthi P
      Blog Post Author

      Thanks Gajesh for comment and sharing very useful thread.