In a Scenario such as needing to add a 4th system to a Logical Component (Pre-Prod), or Remove such a system, please follow the steps below:
In our example we have a Project: ERET_M
Logical component for a system S71: SAP SOLUTION MANAGER [Solution Manager ABAP Stack]
Clients:
101 – Dev
102 – QA
103 – Pre Prod
104 – Training
105 – Prod
Retrofit : RIG 501
Basic steps:
Close current cycle of maintenance project
Save through the next phases until reaching
Being Completed:
Next Agree and Proceed Through,
Adjust Logical components as necessary
From SMSY:
Create a new Logical Component in LMDB
Click Display -> Change
Green Check to Launch LMDB
Add Technical System and Adjust Type
Use transaction Solar_Project_admin
Add / Remove appropriate systems (in this example, adding Test System 104)
Create New Task List
View Task List
Adjust TMS
Dev -> qa
Qa -> pre prod
Pre prod -> prod
Final Product
Dbl Click S71 and Remove Transport Layer, add Development System in table below
Save
Check Project
Create new cycle
Activate CTS Functionality
Check the Landscape
Create Task List
Confirm Changes to Project Landscape in Task List:
Manually catch up transports where required.