Hi All

I would like to share with all my experience while configuring inbound process using POSC. My scenario is like this.

1. Unload stock from door and put at staging area.

2. Move stock from staging area to final bin.

For this, I have configured POSC with two steps

1. INB1 - to unload stock with automatic creation of put-away task

2. INB3 - to put-away stock

After unloading the stock from door, system shows that there no packed/unpacked stock for unloading. Because, I have already completed the first step and using POSC system automatically created put-away task. After confirming the put-away task surprisingly, I could see the status of document as PutAway - Not Started and Warehouse Activity - Partially Completed.

When I go back to /scwm/prdi, follow on functions --> warehouse task, I could see same HU ready for unloading. When I see this, I was surprised and clueless. After going through my POSC and Warehouse process type, I feel that everything looks okay but still no clue about this weird behavior. Finally I found that storage type role (where final bin belongs to) was set to "D" - staging area group.

After changing this to standard storage type, I was able to set the document status as complete.

Thanks

Sasidhar Gupta