Process Order Reconciliation – How to post backdated entry to reduce the actual activity cost on process order

Scenario :

Goods issue, Confirmations,GR completed for process order and Techncially closed. Now the status of the order is TECO.It’s observed that actual cost for activity was confirmed at higher rate as maintained in KP26. Requirement is to reverse the confirmation, correct the activity rate in KP26 and do confirmation again and post as as per old posting date.

Complexity Involved:

  • Periods are closed and not possible to open as per business decisions
  • GR completed un-restricted stock got delivered and now stock is Zero.
  • Activity cost to be reveresed as per posting dates of the order not in current posting period.
  • Quantity adjustments should be not  be done only activity cost should be changed.

How to Handle:

This type of issue can be addressed through manual adjustments using tcode KB21N

Procedure to POST manual CO entry to correct the activity cost without effecting quantity with back dated.

Step 1: Display Process Order : ( Get he Sender, Activity  Type Details) -Tcode (COR3)

Process order 1005277 displayed below shows status as TECO,CNF and DLV is refered as example for posting CO entry.

/wp-content/uploads/2014/03/n1png_406190.png

Go to – Cost Analysis and note down the below details as per screen shot displayed.

  • Sender Cost Center : 200950
  • Sender Activity Type : LABCST
  • Receiver Order : 1005277 (Process Order number where it should be effected)
  • Total Actual Costs for Send CCtr (Sender Cost Center) – 200950 and SAtyTyp (Sender Activity Type) -LABST  is now 4729.50

/wp-content/uploads/2014/03/n1png_406190.png

Step 2: Direct Activity Allocation : Tcode ( KB21N)

Go to tcode KB21N. Change the Scrn var from Cost Center to ALL as displayed below./wp-content/uploads/2014/03/n1_405975.png

Enter the below information in two lines as shown in below screen shot.

Note: Change the document date and posting date as required. Back dated posting is possible without opening any MM periods. If back dated posted, as on date report will come correctly. This is based on no dependnecy like Overhead, WIP and variance calculation on TECO order.

Item No 1 data:

  • Send CCtr (Sender Cost Center) – 200950
  • SAtyTyp (Sender Activity Type) – LABST
  • Rec.Order (Receiver Order) – 1005277 (Process order number where it should be effected) 
  • Total Quantity : -1 (Minus 1)
  • Total price per unit of measure : (Difference price which we want to book on the order + 0.01) – (For this test data i have taken difference as 29.50)

Item No 2 data:

  • Send CCtr (Sender Cost Center) – 200950
  • SAtyTyp (Sender Activity Type) – LABST
  • Rec.Order (Receiver Order) – 1005277 (Process order number where it should be effected) 
  • Total Quantity : 1 (Plus 1)
  • Total price per unit of measure : ( 0.01)

/wp-content/uploads/2014/03/n1_405975.png

Press Enter. Below screen will be displayed.

/wp-content/uploads/2014/03/n1_405975.png

Save. System will generate the document number.

/wp-content/uploads/2014/03/n1_405975.png

Step 3: Display Process Order to see the changes ( COR3)

Go to CO03 – Enter order number – Go to Cost Analysis and now we can note the change in Total Actual cost as shown in below screen shot.

Total actual cost for Send CCtr (Sender Cost Center) – 200950 and SAtyTyp (Sender Activity Type) – LABST is now 4700.00
/wp-content/uploads/2014/03/n1png_406190.png

Thanks & Regards,

Ramagiri

Assigned Tags

      9 Comments
      You must be Logged on to comment or reply to a post.
      Author's profile photo Rajneesh Saxena
      Rajneesh Saxena

      Hi Sri

      Seems a good work around.

      Regards

      Rajneesh Saxena

      Author's profile photo Ramagiri Srinivas Rao
      Ramagiri Srinivas Rao
      Blog Post Author

      Hi Rajneesh,

      Yes you are right. Thanks for your comments.

      Thanks & Regards,

      Ramagiri

      Author's profile photo Anupam Sharma
      Anupam Sharma

      Hi Ramagiri,

      Thanks for sharing the work around to adjust the activities backflush instead of reversing the whole confirmations.

      Regards,

      Anupam Sharma

      Author's profile photo Ramagiri Srinivas Rao
      Ramagiri Srinivas Rao
      Blog Post Author

      Hi Anupam,

      You are right. In some cases it's difficult to do reversal of entire confirmation process. This work around solution will be better option of correcting the actual activity cost without effecting the qty.

      Thanks & Regards,

      Ramagiri

      Author's profile photo A S
      A S

      Hi Ramagiri,

               Nice information. Is this applicable only for process order? can we do the same for production order?

      Thanks

      Author's profile photo Ramagiri Srinivas Rao
      Ramagiri Srinivas Rao
      Blog Post Author

      Hi AKS,

      Thanks for your feedback. You can do for production orders also. I have done for process order to avoid reversal of confirmations.

      Thanks & Regards,

      Ramagiri

      Author's profile photo Former Member
      Former Member

      Dear Ramagiri Srinivas Rao

      really it is an excellent work around to post activity cost  for process order .We had same issue after reffing your post really helped lot

      Author's profile photo Deep D
      Deep D

      Dear Rao,

      Nice work ! Easy to go through.

      Regards,

      Deep D.

      Author's profile photo Subhrant Kumar bal
      Subhrant Kumar bal

      Very needful