Enterprise Resource Planning Blogs by Members
Gain new perspectives and knowledge about enterprise resource planning in blog posts from community members. Share your own comments and ERP insights today!
cancel
Showing results for 
Search instead for 
Did you mean: 
milind_joshi7
Active Participant

Hi Team,

Below are the Steps for Configuration for Availability Check in Sales and Distribution Module.


Configurations at IMG level [Basic Functions/TOR & Av. Ch]

  1. S.No

Configuration

Examples/ Remarks

Description

01

Checking Group

Ex : 01 for Coll. Req.

        02 for Ind. Req.

         etc.

Define Checking Group and specify whether check to be carried out and set for Individual/Collective requirements.

02

Requirement Class

Ex – For Requirement Class 041.

Switch on Availability Check for the Requirement Class.

03

Schedule Line Category

Ex : For CP, C1 etc.

Switch on Availability Check at Schedule Line Category level.

04

Control for Availability Check

Checking Rules are predefined in SD.

Ex : A for SD Order

        B for SD Delivery       

        etc.

Assign Checking Rule to Checking Group and define the scope of Availability Check. The scope includes various stock [safety, transfer etc], Inward/Outward movements, RLT etc.

Other Settings

01

Default Value

Ex : FERT + Plant1000  

        = Ch. Gr. 01.

Checking Group set for [Material Type + Plant ] as default value. Used only if not mentioned in MMR.

02

Material Block

A –Order, B – Delivery Note, C-Reservation. These initiators cannot be changed.

Block indicator can be activated if others have to be blocked from carrying out Av. Ch while it is being checked.

03

Item Category

Ex : REN can be switched off.

Availability Check can be activated or deactivated at Item Category level.

04

System Responses

Ex : A dialog box for selecting one time / complete / delevery proposal.

Based on Sales Area, system responses can be set in Av. Ch. Rule, should there be no/insufficient stock[after Av. Ch].

1 Comment
Labels in this area