Skip to Content
Author's profile photo Michael Piehl

Service Management – Create Revisions

Today I’m going to talk about a little used piece of configuration call Create Revisions.  This configuration is again a grouping field.  By that I mean that there is really no functionality behind this field aside from a field to search on.  With that being said, you do get the option to make the grouping, in this case the revision, a bit more specific to actually be valid for certain dates.  So let’s get down to it.

/wp-content/uploads/2013/11/blog03_01_320249.png

Here’s the location in SPRO.

/wp-content/uploads/2013/11/blog03_02_320250.png

Once you get into transaction you will likely see this screen (unless there is only 1 selection, then it will jump you straight to the next screen.  But if you’re here, you can either view an existing revision or create a new revision.

/wp-content/uploads/2013/11/blog03_03_320252.png

Now here you can enter the planning plant, a unique revision and description for it.  Then give it a start and end date.  If you’re in change mode, you can also click the RevCompleted check box if you no longer wish to have this a valid selection.  Otherwise, it’s pretty self explanatory.

Finally, this is where you can actually assign the revision to a service order.

/wp-content/uploads/2013/11/blog03_04_320253.png

If you’re interested in great tips and tricks on SAP service management, variant configuration or production planning, check out my blog at: http://javeLLinSolutions.com/blog/

There is also a link to some SAP Easy Buttons =)

Thanks for reading,

Mike

CTO – JaveLLin Solutions, LLC

Assigned Tags

      Be the first to leave a comment
      You must be Logged on to comment or reply to a post.