Dear Experts,
When i run standard cost estimate of a product one of the material cost not captured
I checked below things
1.That material was assigned in BOM
2.Price of the material maintained.
3.Don't cost not active of the material
4.When i go through valuation class of the material OBYC-GBB-VBR the cost element & Valuation class maintained properly
5.In our costing sheet & cost component structure that cost elelment was maintained
Please check.
Regards,
Debashis