Dear Experts,

When i run standard cost estimate of a product one of the material cost not captured

I checked below things

1.That material was assigned in BOM

2.Price of the material maintained.

3.Don’t cost not active of the material

4.When i go through valuation class of the material OBYC-GBB-VBR the cost element & Valuation class maintained properly

5.In our costing sheet & cost component structure that cost elelment was maintained

Please check.

Regards,

Debashis

To report this post you need to login first.

2 Comments

You must be Logged on to comment or reply to a post.

  1. Srinivas Salpala

    Hi Debhasis,

    Next time on, create new threads under discussion and not in blog section.

    Check under BOM, double click on the item against the material and check for “Costing relevancy” and “Material provision ind.” under Status/Lng txt tab.

    BR, Srinivas Salpala