COPA Planning
Planning is a key tool available in Profitability Analysis (COPA), which is widely used to plan for annual forecast for Profitability Plans and track the actuals against the planned figures. Planning in Profitability Analysis allows to plan Sales, revenue and profitability data in any selected profitability segments. The planning data can be displayed in various ways, depending on business demands. It is not a standalone component. It can not only send data to other applications but it can also receive planning data from those applications. It is also not limited by any specific time frame. The planning can be done more than one fiscal year at one or on a rolling basis. The data can also be planned by posting periods or calendar weeks. It is also possible to create and store planning data in different plan versions.
The planning framework is the main working environment for sales and profit planning. It contains all possible settings for building the planning framework. The planning can be carried out from this framework screen. MS Excel can be used as a planning screen for planning data in the SAP system. The planning framework allows for planning with or without MS Excel. The various ways in which manual planning can be executed are as under:
- Planning without Excel
- Planning with Excel integrated in SAP Interface
- Planning with offline planning in Excel and
uploading data into the SAP system
The first step in COPA planning is the planning framework. It contains the elements like Planning Level, Planning Package, Planning Method and parameter set. The configuration transaction for creation of planning framework is KEPM. The first step is to set the Operating Concern.
The next step is to create a planning level. Planning level is used to determine the level at which the planning is required to be done using the characteristics. In the transaction code KEPM, right click on Planning Level.
Now enter the planning level and description of the same.
Now right click on the Planning Level created to add the characteristics needed for planning
The characteristic values are specified in a planning package. Right click on the planning level and click on “Create Planning Package”.
Specify the name and description of the planning package.
Enter the values which can be defaulted.
The status of the planning package would be in Red. Double click on the status and change it to the required status
The next important step is the definition of planning method. The planning method is a function with which the planning data can be
entered and changed. The planning method can be manual or automatic. The automatic planning allows to copy and revaluate actual or planning data for a large number of profitability segments at once. On the other hand, the manual planning method allows you to define the planning screens as per requirement at any degree of detail.
The next step in the planning process is the creation of the parameter set. It contains all the settings required for execution of planning
method. Right click on “Enter Planning Data” and than click on “Create Parameter Set”
Enter the parameter set name and description
In the next screen, enter the required details like planning layout, currency etc. and Save it. This would create the parameter set.
There is a checkbox for integration with excel. This check box must be ticked as Active, if integration with excel is required. If this is
not ticked, the excel integration will not work with COPA planning framework. The next step is to define the planning layout. The planning layout will
determine how the screens will look like when the planning data is entered and which fields would appear on the screen. The planning layout can be
created/modified using transaction code KE15 or KE16 or through the parameter set by click on “Create” icon.
Enter the layout description, name and choose the Characteristics as Header and Lead Columns as required.
Choose the value fields that are needed and save
Check if the layout meets the requirements. This can be done in transaction code KE15 or KE16
Other options for editing are available
The planning framework is now complete and we can now execute planning
Planning without Excel Integration
Ensure that Integrated Excel check box is not ticked in the parameter set in transaction code KEPM
Double click on the parameter “SET1”. This would open the planning screen
Now enter the planned values and save
You can check the posting in KE25 or use the path in the menu path as under:
Planning with Integrated Excel
Excel is integrated in the standard SAP planning screen. The checkbox should be ticked in the transaction code KEPM
Now double click on the parameter set to open the excel based planning screen
Once Macros are enabled, embedded excel screen opens in SAP Interface
Once the planned data has been entered, save the planned data
Planning with Excel Upload
Ensure that the Integrated Excel checkbox is ticked in the Parameter set. Double click on the same and go to Excel Integrated planning
screen. Enable the macros. In the planning screen go to Setting and click on Formatting
This will generate a file description as shown below
Now click on “Save File Description”
Now click on “Save Excel Layout” to save the Excel worksheet in the SAP System
Now click on “Generic file” to enter a generic file name. This name must consist of a string of characters (upper case), an asterisk (*), and the file suffix “.TXT” (example: PLAN*.TXT). When you later upload Excel files into the SAP System, this generic file name links the file on your local PC to the file description.
After this save the overall planning as shown below:
In the excel planning screen, do file “Save as” to save the Excel Planning Layout for future use :
Example the excel layout is saved as “PLAN1” on your Local computer. Once the file is saved on the local computer, it is not required to come again to KEPM and execute all the steps for generate of the excel template. Just use the saved excel file, enter the planned data as TXT and upload the same using transaction code KE13N
Save the file in TXT format
Go to KE13N or use the path as below:
You can check the planned data in KE25.
hi,
its good, helpfull , thanq you
Regards:
Kiran
Hello,
Good and useful information.
Thank you very much.
br erwin
Hi,
Nicely presented!!!
BR, Srinivas Salpala
Hi
Excellent Document
Thanks Much
Very informative..!!
hi, very useful , thank u very much.
Very informative...!!
Regards
K.L.Paliwal
This is really very informative. thanks
but what if we have a change in plan, Copa planning cant change the characteristics after save, is there any solution for that, please share
Hi
This is really very informative thanks keep sharing
Trinath
Hi,
I am trying to double click on the parameter set after having saved the layout, the system is giving the message that "No plan data exists for the specified general data selection"
Kindly help
Manish
Very Informative.
Regards
santanu
Thank you very much for your document. Can you guide me how to automatically derive COGS and Sales value in planning.
Very Helpful Document.Thank You very much.
Thanks Indraneel
Regards
Sanil Bhandari
Thanks for sharing this document. Perhaps you could make a copy on the SDN Wiki for Profitability Analysis ?
Hi Jeffery
Thanks for the appreciation.
Sure, I will make a copy there.
Regards
Sanil Bhandari
Estimados, buenas tardes.
Muy buena la explicación.
me gustaría aprovechar este comentario para hacer una consulta.
Consulta, necesito planificar en 2 monedas en PA.
tengo la SOC PA en USD y la CO en CLP.
cuando planifico en USD en la SOC PA ingresa los valores en CLP.
si planifico 3 USD en la KE25 muestra los 3 multiplicados por el tipo de cambio.
Ejemplo:
ingreso 3 USD y el tipo de cambio es 540 clp en PA me registra 1.620 CLP.
en ninguna parte me deja registro que planifique en USD.
como puedo saber eso.
Saludo.
CristianZick
Hello,
Excellent Document.
Regards,
Suman
Thanks a million Suman
Cheers
Sanil
Wonderful... Very helpful.
Thanks much
Regards
Sanil Bhandari
Very very useful document.
Regards
Nayeemullah Ansari
Thanks much
regards
Sanil Bhandari
Thank you! very helpful and explained well.
Thanks
Informative and very well explained. Thank you.
Regards,
Sanket Sachde
Thanks a lot
regards
Sanil
Thanks a lot.. Very useful document.
Thanks a lot for this.
I am getting a message "Maintain number range for planning record type B" and can not continue with saving the plan values.
Can anybody help?
Thanks,
Andreas
I think that you have to check your planning layout Tcode KE15
Then choose Edit -> Gen. data selection -> Gen. data selection and choose B for record type
hope that do the job.
Best Regards,
Seif
Thank you for this work
Very helpfull
Good work Sanil.
SEM-BPS is more robust, however most of the the fundamentals of COPA Planning and SEM-BPS are the same.
Thanks a lot Ravi Sankar Venna
Appreciation from you is always an immense morale booster
regards
Sanil Bhandari
Very Nice document sanil,
Just check if you can add automatic planning also in this.
Thanks
Cma Mahesh Rathi
Hi,
I have followed the steps which you have given and it works excellent.
But now I am facing a small concern I am not able to edit the period of posting.
All my docuemnts are getting posted in 001.2016. I am not able to change the period.
Can u please help me how to change the period/year?
Thanks,
Divya Gunasekaran.
Hi Sanil, very nice document with useful instructions.
I am new to copa planning and did everything following your instructions and still getting the same error: file description does not exist, message no. DUE010. I read every thread and SAP note related to COPA planning issues and still cannot solve that isuue whatevar i try. I am workin on QAS client of ERP 6.0 EHP 8 on Hana and using Excel 2016. I would really appreciate if you can advise me what to do to find out cause of the problem or solve the issue?
Best regards,
Tomislav
Hi Sanil ,
Nice job
A big help for all of us here
Keep up the good work
Would love to see more on using ke30 ke31 & assessment cycles
Regards,
Sadat Khan , CMA
Very helpfull, thanks.
One note, in S/4 is not possible display data in KE25 until instal OSS note 2332929.
Hi Sanil Bhandari,
Thank you for sharing such a wonderful and informative article on planning.
Can you please also share a post on transporting approach for planning from one environment to another?
Example - should one first transport planning layout or level or package? or does transporting data flow planning from operating concern does all the work?
Thank you,
Rohan.
Hello Rohan Jumani
I have responded to the query posted by you on community as a question. The below link should help you on the same.
https://answers.sap.com/questions/7303814/transport-co-pa-planning-kepm.html
Thanks & regards
Sanil
Thank you Sanil Bhandari, , really appreciate your help and support.
Regards,
Rohan.