Account assignment can be changed during invoice processing, how to bring control over it

Cause: If account assignment e.g. for cost center is changeable in the Invoice, then posting to cost object can be different from that done during goods receipt. This will cause inconsistency in the system.


One must do a configuration setting in order to bring control over the accounting documents

IMG path

IMG / Materials Management / Purchasing / Account Assignment / Maintain Account Assignment Categories

You will get the below screen

AAC1.png

There is lot of account assignment category, one must need to verify according to the scenario of the customer. Here, I have taken example of a cost center “K” . Double click the line item, you will be followed by below screen shot.

ACC2.png

Now uncheck “ AA chgable at IR” and save the configuration setting,

AAC3.png

User now will not be able to edit account assignment in Invoice receipt. This is very useful and also was noticed in one of our clients and I made the required changes.

Assigned Tags

      3 Comments
      You must be Logged on to comment or reply to a post.
      Author's profile photo Former Member
      Former Member
      Blog Post Author

      any comments or suggestions are welcome,

      Thanks

      Sudhir Krishna Kumar Singh

      Author's profile photo Former Member
      Former Member

      Hi,

      sometimes acc assignment cat not available into the material masters,

      though such docs could be tracked through VFX3,Your docs is really helpful,

      BR,

      Devendra

      Author's profile photo Former Member
      Former Member
      Blog Post Author

      Thanks Devendra for appreciating 🙂