Skip to Content

Generic Delta in Generic Datasource – Upper & Lower Limit

Generic Delta in Generic Datasource:

Lower Limt (LL)

Upper Limit (UL)

 

Lower Limit with Calendar Day:

 

Example-1

Lower Limit is “0”

02.06.2013

03.06.2013

04.06.2013

05.06.2013

06.06.2013 ——- Sy_datum is current date

For suppose if we set Lower Limit (LL) as “0“.It will take both 06.06.2013 and 05.06.2013 dates because before current date(06.06.2013) is 05.06.2013 date so by default it take 05.06.2013 and 06.06.2013

Example-2

Lower Limit is “1”

02.06.2013

03.06.2013

04.06.2013

05.06.2013

06.06.2013 ——- Sy_datum is current date

For suppose if we set Lower Limit (LL) as “1“.It will take from 06.06.2013 to 04.06.2013

dates.

 

/wp-content/uploads/2013/09/1_272569.jpg

Example-3

Lower Limit is “2”

02.06.2013

03.06.2013

04.06.2013

05.06.2013

06.06.2013 ——- Sy_datum is current date

For suppose if we set Lower Limit (LL) as “2“.It will take from 06.06.2013 to 03.06.2013

dates.

 

Example-4

Lower Limit is “3”

02.06.2013

03.06.2013

04.06.2013

05.06.2013

06.06.2013 ——- Sy_datum is current date

dates.

For suppose if we set Lower Limit (LL) as “3”. It will take from 06.06.2013 to 02.06.2013

Upper Limit with Calendar day:

 

Example-1

Upper Limit is “0”

02.06.2013

03.06.2013

04.06.2013

05.06.2013

06.06.2013 ——- Sy_datum is current date

In Upper Limit it will always exclude Current Date.

 

For suppose, if we set

Upper Limit (UL) as “0“.It will take 05.06.2013 dates because Upper limit will always excluded Current Date (06.06.2013).  

/wp-content/uploads/2013/09/2_272570.jpg

Example-2

Upper Limit is “1”

02.06.2013

03.06.2013

04.06.2013

05.06.2013

06.06.2013 ——- Sy_datum is current date

For suppose, if we set

to

Example-3

Upper Limit is “2”

02.06.2013

03.06.2013

04.06.2013

05.06.2013

06.06.2013 ——- Sy_datum is current date

For suppose, if we set

 

Example-4

Upper Limit is “3”

02.06.2013

03.06.2013

04.06.2013

05.06.2013

06.06.2013 ——- Sy_datum is current date

For suppose, if we set

Upper Limit (UL) as “3”.It will take from 05.06.2013 to 02.06.2013

/wp-content/uploads/2013/09/3_272571.jpg

9 Comments
You must be Logged on to comment or reply to a post.