Skip to Content

Generic Delta in Generic Datasource:

  • Lower Limit (LL)
  • Upper Limit (UL)

   8.PNG

10.PNG

For suppose if we set Lower Limit (LL) as “0”.It will take both 06.06.2013 and 05.06.2013 dates because  before current date (06.06.2013) is 05.06.2013 date.

2.PNG

    For suppose if we set Lower Limit (LL) as “1”.It will take from 06.06.2013 to 04.06.2013 dates.

Upper Limit with Calendar day:

3.PNG


  • In Upper Limit it will always exclude Current Date.

        For suppose, if we set Upper Limit (UL) as “0”.It will take 05.06.2013 dates because Upper limit will always excluded Current Date (06.06.2013).

4.PNG

  For suppose, if we set Upper Limit (UL) as “1”.It will take from 05.06.2013 to 04.06.2013.

Thanks & Regards


Trinadh Kumar Reddy B.

Senior Software Engineer

iGATE_LOGO.PNG


To report this post you need to login first.

Be the first to leave a comment

You must be Logged on to comment or reply to a post.

Leave a Reply