Contract: Chevron Upstream Europe

I started here at chevron in February 2012 and I have been assisting the client with the following:

  1. Transferring one of the smaller assets into SAP involving the usual data acquisition/conversion process and also standardising processes.
  2. System developments, for example:
    • Report creation/corrections
    • A new report based on IP19 that creates a 5-year look-ahead report at operation level including planned costs per operation.
  3. Implementation of the Prometheus PM Advanced tool-set. Although our main driver is the Graphical Work Order Scheduler (GWOS), we will probably be implementing the Navigator, Print Manager and Mass Change functions too.