Skip to Content

Like to share one issue which was faced with S021 – MCPM and MCRV reports for the benefit of forum members. Initially process order created with quantity as 600. Later process order quantity was changed to 400. In MCPM and MCRV reports displays the process order quantiity which was planned initially.

Changed Process Order:

/wp-content/uploads/2013/04/mc1_394583.png

MCPM Report display after change of process order qty:

/wp-content/uploads/2013/04/mc2_394584.png

Config available in System:

COR4 – Order Type dependend parameters –  Statistics is checked.

/wp-content/uploads/2013/04/mc3_394585.png

OMOD – Updating Shop Floor Control Info Structures: Update “2” for all info cubes (Asynchronous update).

/wp-content/uploads/2013/04/mc4_394586.png

Analysis: Any changes in the order after release will not be reflecting in the MCPM and MCRV reports if release is activated in customizing (OPL5).This is as per SAP Note 100082 – Change is not updated after release .

Conclusion: Config changes done as given below in OPL5 and thereafter any changes on order are reflected in MCPM and MCRV reports.

/wp-content/uploads/2013/04/mc5_394588.png

Apart from the above reports there are reports like COIO – Order Info System for PP-PI and COID – Select Object Detail Lists in PP-PI which gives process order quantity, confirmed qty, scrap quantity and delivered qty along with order number, material number and description.

To report this post you need to login first.

Be the first to leave a comment

You must be Logged on to comment or reply to a post.

Leave a Reply