Objective:

This document describes about restarting a failed process chain from next step. Sometime it is necessary to restart process chain from next step because either we fixed failed step manually or previous step is not relevant for next step processing. It will help to save time and avoid manually running each step.

Environment:

SAP BW system

Process/Steps:

We need to set the failed step or request to green in the database level and raise the event that will force the process chain to run from the failed step to the next step.

Therefore we need to open the messages of a failed step by right clicking on it and selecting ‘display messages’.

P1.jpg

In the opened popup click on the tab ‘Chain’.

/wp-content/uploads/2013/04/p2_210455.jpg

In a parallel session go to transaction SE16 and open the table rspcprocesslog.

/wp-content/uploads/2013/04/p3_210456.jpg

Provide below entries and execute it to get log id and process type.

1.     Variant

2.     Instance

/wp-content/uploads/2013/04/p4_210457.jpg

/wp-content/uploads/2013/04/p5_210461.jpg

Open another session and go to transaction SE37.

Enter RSPC_PROCESS_FINISH as the name of the function module and run the function module in test mode.

/wp-content/uploads/2013/04/p6_210462.jpg

We will copy the entries of table rspcprocesslog to the input parameters of the function module like described as follows:

  1. rspcprocesslog-log_id -> i_logid
  2. rspcprocesslog-type -> i_type
  3. rspcprocesslog-variant -> i_variant
  4. rspcprocesslog-instance -> i_instance
  5. Enter ‘G’ for parameter i_state (sets the status to green).

Execute function module with execute button or press F8.

/wp-content/uploads/2013/04/p7_210463.jpg

It will set the actual process to green and the following process in the chain will be started.

Other useful tips:

  • Sometime a particular step in a process chain has status as yellow since log and process monitor/job log entries are not available.  In such case we will go to the messages of yellow step by right clicking on it and selecting ‘display messages’. In the opened popup click on the tab ‘Chain’. If Instance is blank under this tab it means process is not triggered. So instead of waiting for long better to cancel the job manually and restart it.

/wp-content/uploads/2013/04/p8_210473.jpg

  • Sometime even status in process chain monitor indicates that process got finished (status green), next node is not getting started. In such case check in RSPCPROCESSLOG table using variant and instance. Usually In such scenario among 2 states field (STATE and ACTUAL_STATE) one is updated with status G and another is blank. Here also use the steps as describe above by using function module RSPC_PROCESS_FINISH to make overall status green. It will start process chain from next node.

/wp-content/uploads/2013/04/p9_210474.jpg

Hope it will help in process chain job monitoring and fixing.

To report this post you need to login first.

9 Comments

You must be Logged on to comment or reply to a post.

  1. Rainer Winkler

    Hi Sangita,

    just followed your advice and it worked. But is that the official process we should follow? Are there notes from SAP that describe this action? That would be better, as notes can be changed if needed? Or is SAP requiring us to raise a Very High Message, so that they do this?

    With kind regards

    Rainer Winkler

    (0) 
    1. Jürgen Noe

      Hi,

      indeed this problem is very old. See Siegfrieds blog to the same issue years ago:

      Restarting Processchains

      With BW 7.3 you can skip steps, but for versions below, it’s the only way to

      ‘continue’ a chain. No official SAP notes available.